WEI Jun,LI Hao,YANG Man-juan,et al.Stability analysis ofrock around tunnel-type anchorage of Siduhe suspension bridgebased on ABAQUS software[J].Chinese Journal of Rock Me-chanics and Engineering,2005,24(Supp1):4894-4899.
DONG Zhi-hong,ZHANG Qi-hua,DING Xiu-li,et al.Numericalanalysis of rock mass stability in tunnel anchorage of Aizhai Bridge[J].Journal of Yangtze River Scientific Research Institute,2005,22(6):54-58.
ZHU Jie-bing,WU Ai-qing,HUANG Zheng-jia,et al.Pullingtest of anchorage model of Siduhe suspension bridge[J].Journalof Yangtze River Scientific Research Institute,2006,23(4):51-55.
WU Ai-qing,PENG Yuan-cheng,HUANG Zheng-jia,et al.Rockmechanics comprehensive study of bearing capacity characteristicsof tunnel anchorage for super-large span suspension bridge[J].Chinese Journal of Rock Mechanics and Engineering,2010,29(3):433-441.
WANG Hai-bin,GAO Bo.Calculation method of bearing capacityof compound tunnel anchorage system of suspension bridge[J].Journal of Southeast University:Natural Science,2005,35(Supp1):89-94.
HU Bo,ZENG Qian-bang,RAO Dan,et al.Study on deformationlaw and failure mechanism of anchorage-surrounding rock systemunder tensile-shear complex stresses:Taking super-large suspen-sion bridge on Baling River for example[J].Chinese Journal ofRock Mechanics and Engineering,2007,26(4):712-719.
XIA Cai-chu,CHENG Hong-xin,LI Rong-qiang.Testing study offield structure model of the east anchorage of Guangdong HumenBridge[J].Chinese Journal of Rock Mechanics and Engineering,1997,16(6):571-576.
XIAO Ben-zhi,WU Xiang-chao,PENG Chao-quan.Stability of theanchorage wall rock of tunnel for Chongqing Egongyan Bridge[J].Chinese Journal of Rock Mechanics and Engineering,2005,24(Supp2):5591-5597.
[19]
ZENG Qian-bang,WANG Si-jing,PENG Yun-dong,et al.Nu-merical simulation on scheme comparison between two concrete-plug lengths of west tunnel-type anchorage of Balinghe suspensionbridge[J].Hydrogeology and Engineering Geology,2005,32(6):66-70.