LI Ri-yun.ZHANG Ming-qiang,BAI Po.Miansha ditch high em‘ bankment alternative schemes[J].China S Water Transportation, 2007.7(12):105-106. nisMand stability analysis of the pianshan landslide in geheyan res- erv0ir area 0f the middle reaches of the qingj iang rive[J].Journal of Jilin University:Earth Science Edition,2009,39(5):874-
PENG Tie-jun.Technical& economical analyses of choices be- tween high filling embankment and viaduct[J].Central South Highway Engineering,2001,26(3):75-76.
[4]
谢伟强.山区高速公路高路堤与高架桥的选择[J]华东公路, 2010(4):54-55.
[5]
XIE Wei-qiang. Mountain area highway high embankment and the choice of the viaduct[J].East China Highway,2010(4):54-55.
WANG Chun-mei,HU Ji-long,HOU Yan·feng.Application of re‘ dynamic compaction technique tO high embankment of Yu Lin ex‘ pressway[J].Journal of Chongqing Jiaotong University,2007,26 (2):97-100.
GUO Nai-zheng,ZOU Jin-feng,YANG Xiao-li,et a1.Research of test and simulation on dynamic compaction in high roadbed[J] Journal of Railway Science and Engineering,2007,4(3):1 40- 143.