SHI Yan-wen, CAO xiao-yong, HAN Chang-ling, et al. Numerical simulation of large sections highway tunnel lord holes and garage horizontal hole intersection[J] .Sino-foreign Highway,2009,4,405-409.
HUANG Ming, LIU Xin-rong, YANG Wu-zhong, et a.l Cau ses analysis and treatment for the lining crack of crossing section in a deep buried large tunnel[J] .Geotechnical Investigation& Surveying, 2009(6) : 45-61.
[7]
Itascea Consulting Group, In c..Fast Lagran gian Analy of Continua in 3D Version 2.10: Users Manual[M ] .FLAC 3D .USA: Itasca Consulting Group, In c., 2002.
[8]
DENG Zhigang, ZHANG Qing-he, WU Min-hui, etal. Large subway cross the interchange station constructions tagede formation forecast[J].Rock Mechanics and Engineering Journal. 2006, 6(20) : 2929-2936.
GE Xiao-guang. Dynamic construction mechanical behavior of a deeply-buried intersection tunnel[J ] .Chongqing Construction University Journals, 2008, 30(2) : 26-31.
WANG Wei, YANG Zhuan-yun, YI Li, et al. Comprehensive strengthening treatment of soft surrounding rocks at shallow and unsymmetrical loading tunnel en trance[J] .Journal of Chongqing Jiaotong University, 2010(5) : 697-699.
Bieniawski ZT. Determining rock mass deform ability: experience from case histories[J] .International Journal of Rock Mechanics and Mining Sciences&Geo mechanics, 1978, 15: 237-248.
[23]
Hoek E, Carlos C T, Brent C. Hoek-Brown failure criterion: RobLab 1.0 user manual [M] .Vancouver, Canada:[s.n.] , 2002: 15 -19.
[24]
Tharea DVR, Nata Rajan, Madhavan K.S tructure analysis and design of bifurcating tunnels[J] .Water Power& Dam Construction, 1980, 32: 42-46.