全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

库水位等速下降中均质库岸塌岸现象试验研究

, PP. 115-119

Keywords: 水库塌岸,库水位下降,均质岸坡,浸润线,bankcaving,loweringwaterlevel,homogeneousbank,phreaticline

Full-Text   Cite this paper   Add to My Lib

Abstract:

:?为研究库水位等速下降过程中均质水库岸坡的塌岸现象及岸坡内浸润线的变化特点,以取自三峡库区的含黏粒粉砂为主要试验土料,对建立的4个不同结构的均质岸坡模型进行了7种不同速率的水位下降试验。试验结果表明,库水位下降速率越大,均质水库岸坡的塌岸现象越易发生,但库水位下降速率的大小并不与塌岸现象的严重程度成正相关关系;试验测得浸润线与理论计算结果的比较分析表明,当水位下降速率较小时,浸润线的理论计算结果与试验结果基本一致,但是当水位下降速率较大时,理论计算结果可能会低估浸润线的位置。

References

[1]  [7] Morgenstern N R.Stability charts for earth slopes during rapiddrawdown[J].Geotechnique,1963,13(2):121-131.
[2]  [8] Lane P A,Griffiths D V.Assessment of stability of slopes underdrawdown conditions[J].Journal of Geotechnical and GeoenvironmentalEngineering,2000,126(5):443-450.
[3]  [9] Zhan Tony L T,Zhang W J,Chen Y M.Influence of reservoir levelchange on slope stability of a silty soil bank[C]/ / Proceedingsof the Fourth International Conference on Unsaturated Soils.US.:ASCE,2006: 463-472.
[4]  [1] Dai F C,Deng J H,Tham L G,et al.A large landslide in ZiguiCounty,Three Gorges Area [J].Can.Geotech.J,2004,41:1233-1240.
[5]  [2] Deng Q L,Zhu Z Y,Cui Z Q,et al.Mass rock creep and landslidingon the Huangtupo slope in the reservoir area of the ThreeGorges Project,Yangtze River,China[J].Engineering Geology,2000,58(1):67-83.
[6]  [3] Jappelli R,Musso A.Slope Response to Reservoir Water LevelFluctuations[C]/ /Proceedings of the 10th International Conferenceon Soil Mechanics and Foundation Engineering.Stockholm:A.A.Balkema,1981,3: 437-442.
[7]  [4] 王跃敏,唐敬华,凌建明.水库塌岸预测方法研究[J].岩土工程学报,2000,22(5):569-571.
[8]  WANG Yue-min,TANG Jing-hua,LING Jian-ming.Studyon prediction method for reservoir bank caving[J].Chinese Journalof Geotechnical Engineering,2000,22(5):569-571.
[9]  [5] 许强,黄润秋,汤明高,等.山区河道型水库塌岸研究[M].北京: 科学出版社,2009.
[10]  XU Qiang,HUANG Run-qiu,TANG Ming-gao,et al.Studyon Bank Collapse of Mountain Channel-type Reservoirs[M].Beijing:Science Press,2009.
[11]  [6] 汤明高,许强,黄润秋,等.三峡库区塌岸预测参数及其影响因素研究[J].成都理工大学学报: 自然科学版,2006,33(5):460-464.
[12]  TANG Ming-gao,XU Qiang,HUANG Run-qiu,et al.Study onthe forecasting parameters of the bank failure and the influence factorsin the Yangtze Three Gorges Project Region,China[J].Journalof Chengdu University of Technology: Natural Science.,2006,33(5):460-464.
[13]  [10] Jia G W,Zhan Tony L T,Chen Y M,et al.Performance of alarge-scale slope model subjected to rising and lowering water levels[J].Engineering Geology,2009,106: 92-103.
[14]  [11] 郑颖人,时卫民,孔位学.库水位下降时渗透力及地下水浸润线的计算[J].岩石力学与工程学报,2004,23 (18):3203-3210.
[15]  ZHENG Ying-ren,SHI Wei-min,KONG Wei-xue.Calculationof seepage forces and phreatic surface under draw down conditions[J].Chinese Journal of Rock Mechanics and Engineering,2004,23(18):3203-3210.
[16]  [12] 王俊杰.土质沿河路基失稳机理及稳定性分析方法: 博士后研究工作报告[R].重庆: 重庆大学,2009.
[17]  WANG Jun-jie.The Stability Analysis Method and InstabilityMechanism of Soil Subgrade along the River: Postdoctoral ResearchingReport[D].Chongqing: Chongqing University,2009.
[18]  [13] Yan Z L,Wang J J,Chai H J.Influence of water level fluctuationon phreatiu line in silty soil model slope[J].Engineering Gelogy,2010,113(1-4):90-98.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133