XIE Xiao-li,ZHAO Guo-fan,HU An-ni,et al.The secondorderanalysis of pre-raised height of concrete-filled steel tube archbridge during construction considering temperature effect[J].EngineeringMechanics,2005,22(4):54-57.
[5]
[9] JTG D 61—2005 公路圬工桥涵设计规范[S].北京: 人民交通出版社,2005.
[6]
JTG D 61—2005 Code for Design of Highway Masonry Bridges andCulverts[S].Beijing: China Communication Press,2005.
[7]
TU Guang-ya,YAN Dong-huang,ZHANG Ke-bo.Calculationmethod and countermeasure for closure temperature influencein trussed CFST arch bridge[J].Engineering Mechanics,2008,25(4):236-240.
LIU Zheng-yu,CHENG Bao-chun.Thermal property analysis ofCFST arch rib during construction[J].The Journal Highway andTransportation of Research and Development,2006,23(5):48 -51.
LIU Zheng-yu,CHEN Bao-chun.Finite element analysis ontemperature field of CFST members under solar Radiation[J].TheJournal Highway and Transportation of Research and Development,2008,25(7):49-53.
DU Hong-tian,ZHANG Ming-zhong.The influence of arch figurefrom temperature change for CFST arch bridge during construction[J].The Design of Railway Standard,2008,23 (6 ):59-63.
[15]
[7] 李廉琨.结构力学[M].北京: 高等教育出版社,2004.
[16]
LI Lian-kun.Structure Mechanic[M].Beijing: Higher EducationPress,2004.
[17]
[8] JIG D 60—2004 公路桥涵设计通用规范[S].北京: 人民交通出版社,2004.
[18]
JTG D 60—2004 General Code for Design of Highway Bridges andCulverts[S].Beijing: China Communication Press,2004.