秦顺全.分阶段成形结构过程控制的无应力状态控制法[J]。中 国工程科学, 2009, 11(10): 72-78. Qin Shun-quan.Unstressed state control method for process control of structure formed by stages[J]。China Engineering Science,2009, 11(10): 72-78.
肖军,张永水,董义.悬索桥锚跨索股分析及程序实现[J]。重 庆交通大学学报: 自然科学版,2 011,3 0(5): 907-910. Xiao Jun,Zhang Yong-shui,Dong Yi.Suspension anchor span strand analysis and program implementation[J]。Journal of Chongqing Jiaotong University: Natural Science,2011, 30(5): 907-910.
[8]
张劲泉,何玉珊,戴正宏.虎门悬索桥上部构造施工监测与控制 技术研究[J]。公路交通科技,2 001,1 8(2): 19-23. Zhang Jing-quan,He Yu-shan,Dai Zheng-hong.Study on humen bridge superstructure construction supervision and control[J]。Journal of Highway and Transportation Research and Development, 2001,1 8(2): 19-23.
[9]
蒲军平,刘鹏.VB 界面设计与FORTRAN 数值计算功能的组合 应用[J]。计算机应用与软件,2 010,2 7(12): 148-150. Pu Jun-ping,Liu Peng.Applying VB and FORTRAN mixed programming in structural dynamic analysis[J]。Computer Applications and Software,2010,27(12): 148-150.