Lin Zhengzhen,Ye Yanyi. Design and construction of 100000 DWT mooring buoy in Meizhou bay anchorage [J]. Port & Waterway Engineering,2000( 6) : 18 - 22.
[5]
洪承礼. 港口规划与布置[M]. 北京: 人民交通出版社,2007:25 - 30.
[6]
JTJ 215—1998 港口工程荷载规范[S]. 北京: 中华人民共和国交通部,1998.
[7]
JTJ 213—1998 海港水文规范[S]. 北京: 中华人民共和国交通部, 1998.
[8]
刘超. 海洋工程锚泊系统计算与分析[D]. 武汉: 武汉理工大学, 2007.
[9]
Thomas Telford LTD. Offshore Mooring [M]. London: Institution of Civil Engineers,1982: 95 - 115.
[10]
Gregory P T. Marine Structures Engineering: Specialized Application[M]. 3rd Ed. . New York: Champan & Hall,2002: 370 -410.
[11]
Chung Jinsug,Michael M B. Hydrodynamic memory effect on stability,bifurcation and chaos of two-point mooring system [J].Journal of Ship Research,1997,41( 1) : 26 - 44.