Gu Yonggui,Li Fan. Research on the calculation method of prestressed chamber slab under the double-parameter ground model[J].Ground and Foundation,2010,24( 3) : 364-369.
[3]
王大庚. 预应力混凝土在整体式闸室结构中的应用研究[D].南京: 河海大学,2007.
[4]
Wang Dageng. Research on the Application of Presressed Concrete on Depressed Chamber Structure [D]. Nanjing: Hohai University,2007.
[5]
刘晓平,陶桂兰. 渠化工程[M]. 北京: 人民交通出版社,2009.
[6]
Liu Xiaoping,Tao Guilan. Canalization Project[M]. Beijing: China Communications Press,2009.
[7]
周氐,章定国,钮新强. 水工混凝土结构设计手册[M]. 北京:中国水利水电出版社,1998.
[8]
Zhou Di,Zhang Dingguo,Niu Xinqiang. The Design Manual of Hydraulic Concrete Structures [M]. Beijing: Water Conservancy and Hydropower Press of China,1998.
Li Zhu,Gao Jianquan. The primary analysis of difference between theoretic form and actual form about successive prestress reinforced steel bar [J]. Journal of Taiyuan University of Technology,2004, 35 ( 3) : 285-288.
[11]
李国平. 预应力混凝土结构设计原理[M]. 北京: 人民交通出版社,2009.
[12]
Li Guoping. Design Principles of Prestressed Concrete Structures[M]. Beijing: China Communications Press,2009.