Surveying and Designing Institute of Chongqing Shipping Engineering, Yangtze River. Feasibility Study Report on the Second-Phase Waterway Construction in the Main Route of Yangtze River,from Hejiangmen,Yibin to Naxi,Luzhou [R]. Chongqing: Surveyingand Designing Institute of Chongqing Shipping Engineering,YangtzeRiver,2006: 14-29.
Chongqing Jiaotong University. Research Report on Numerical Model of Waterway Regulation of Tonggutan,the Upper Reaches of Yangtze[R]. Chongqing: Chongqing Jiaotong University,2005: 33-37
Chongqing South-West Marine Traffic Engineering Science Institute.Research Report on Fixed-Bed Model Test of Waterway Regulation of Tonggutan,the Xu-Lu Section of the Main Route of Yangtze [R]. Chongqing: Chongqing South-West Marine Traffic Engineering Science Institute,2006: 36-39.
Chongqing South-West Marine Traffic Engineering Science Institute.Research Report on Mobile-Bed Model Test of Waterway Regulation of Tonggutan,the Xu-Lu Section of the Main Route of Yangtze[R]. Chongqing: Chongqing South-West Marine Traffic Engineering Science Institute,2006: 18-20.
Chongqing Jiaotong University. Technical Research Report on the Regulation of the Typical Pebbly Dangerous Shoal,the Xu-Yu Section of Yangtze[R]. Chongqing: Chongqing Jiaotong University,2007: 81.
Surveying and Designing Institute of Chongqing Shipping Engineering,Yangtze River. Preliminary Design on the Second-Phase Waterway Construction in the Main Route of Yangtze River,from Hejiangmen,Yibin to Naxi,Luzhou. [R]. Chongqing: Surveying and Designing Institute of Chongqing Shipping Engineering,Yangtze River,2007: 10-49.