Lou Zhuanghong.Multi-span cable-stayed bridges [J].Journal of Highway and Transportation Research and Development,2002,19 (2): 79-83.
[3]
JTG D60—2004 公路桥涵设计通用规范[S].北京: 人民交通出 版社,2 004.
[4]
JTG D60—2004 General Code for Design of Highway Bridges and Culverts [S].Beijing: China Communications Press,2004.
[5]
Cremona C.Optimal extrapolation of traffic load effects [J].Structure Safety,2001,23(1): 31-46.
[6]
O’Connor A,Eichinger E M.Site-specific traffic load modeling for bridge assessment [J].Proceedings of the ICE: Bridge Engineering, 2007,160(4): 185-194.
[7]
Nowak A S,Lutomirska M,Sheikh Ibrahim F I.The development of live load for long span bridges [J].Bridge Structure-Assessment, Design & Construction,2010,6(1): 73-79.
Bao Weigang,Li Yanghai,Zheng Shaogui,et al.Vehicle loads research for Highway Bridge[C]/ / China Civil Engineering Society for Bridge and Structural Engineering Institute: 12th Annual Meeting Proceedings of China Civil Engineering Society for Bridge and Structural Engineering Institute.Beijing: China Communications Press,1997.
Ruan Xin,Guo Ji,Yan Zhenguo,et al.Operational Safety Risk Assessment and Countermeasures Research for Qingdao Bay Bridge: Study on Component Fragility and Structure Robustness [R].Shanghai: Tongji University,2010.
[14]
Virlogeux M.Bridges with multiple cable-stayed spans[J].Structural Engineering International,2001,11 (1): 61-82.