千米级混合梁斜拉桥无应力索长及几何线形控制

DOI: 10.3969/j.issn.1674-0696.2013.03.02, PP. 374-378

Keywords: 混合梁斜拉桥,施工控制,几何控制法,无应力索长控制,几何线形控制,hybridgirdercable-stayedbridge,constructioncontrol,geometrycontrolmethod,unstressedcablelengthcontrol,geometriclinearcontrol

Full-Text   Cite this paper   Add to My Lib

Abstract:

:?针对千米级混合梁斜拉桥施工期结构受力特点及制造加工和安装阶段面临的主要问题,基于几何控制理论,以主跨926m的鄂东长江公路大桥为依托,研究斜拉索无应力长度及主梁几何线形控制方法结果表明:以理想成桥线形索力为目标,通过对制造及安装阶段全过程无应力状态量的调整,安装阶段将无应力线形无应力索长的控制转换成夹角引伸量的控制,该方法易规避不良施工效应施工误差,高效快捷精度高,同时能降低环境带来的不良影响施工实践表明实测数据与理论计算吻合很好,证实了该方法的有效性和可靠性

References

[1]  Huang Can,Bu Yizhi,Zhang Qinghua. Numerical verification of geometry control theory of the construction for super-span cablestayed bridge [J]. Engineering Sciences,2009,11(1) : 87-90.
[2]  翟世鸿,张照霞. 国内超大跨度钢斜拉桥上部结构施工控制探讨[J]. 中外公路, 2006, 26(1) : 108-112.
[3]  Zhai Shihong,Zhang Zhaoxia. Discussion of the construction control of the upper structure of domestic super-span steel cable-stayed bridge[J]. Journal of China & Foreign Highway, 2006, 26(1) : 108-112.
[4]  Manabe Y,Hirahara N,Mukasa N,et al. Accuracy Control on the Construction of Tatara Bridge[C]. Malmo Sweden: IABSE Conference,1999.
[5]  Yanaka Y,Takazawa T,Hirahara N. Erection of the Tatara Bridge's Superstructure[C]∥Long-Span and High-Rise Structures. Switzerland:IABSE,1998: 75-80.
[6]  李乔,卜一之,张清华. 基于几何控制的全过程自适应施工控制系统研究[J]. 土木工程学报,2009,42(7) : 69-77.
[7]  Li Qiao,Bu Yizhi,Zhang Qinghua. Whole-procedure adaptive construction control system based on geometry control method [J]. China Civil Engineering Journal,2009,42(7) : 69-77.
[8]  秦顺全. 无应力状态控制法———斜拉桥安装计算的应用[J].桥梁建设, 2008(2) : 13-16.
[9]  Qin Shunquan. Application of unstressed state control method to calculation for erection of cable-stayed bridge [J]. Bridge Construction,2008(2) : 13-16.
[10]  陈开利,余天庆,习刚. 混合梁斜拉桥的发展与展望[J]. 桥梁建设, 2005(2) : 1-4.
[11]  Chen Kaili,Yu Tianqing,Xi Gang. Development and prospective of hybrid girder cable-stayed bridge [J]. Bridge Construction,2005(2) : 1-4.
[12]  石雪飞,项海帆. 斜拉桥施工控制方法的分类分析[J]. 同济大学学报,2001, 29(1) : 55-59.
[13]  Shi Xuefei,Xiang Haifan. Analysis of construction control systems of cable-stayed bridge[J]. Journal of Tongji University,2001,29(1) : 55-59.
[14]  黄冰释,唐守峰,赵灿晖. 鄂东大桥施工期结构行为与施工监控关键技术[J]. 重庆交通大学学报: 自然科学版,2010,29 (5) :688-692.
[15]  Huang Bingshi,Tang Shoufeng,Zhao Canhui. Structure behavior and construction monitoring key technology in construction of Edong Changjiang River Bridge[J]. Journal of Chongqing Jiaotong University: Natural Science,2010, 29(5) : 688-692.
[16]  Li Qiao,Dong Xuewu,Huang Can,et al. Sensitivity Analysis of Structural Parameters for Super-Span Cable-Stayed Bridge and Its Application[C]. Taipei: The 11th East Asia-Pacific Conference on Structural Engineering & Construction, 2008.
[17]  黄灿,卜一之,张清华. 特大跨度斜拉桥施工几何控制原理的数值验证[J]. 中国工程科学, 2009, 11(1) : 87-90
[18]  李乔,卜一之,张清华,等. 大跨度斜拉桥施工全过程及几何控制概论与应用[M]. 成都: 西南交通大学出版社,2009.
[19]  Li Qiao,Bu Yizhi,Zhang Qinghua,et al. Conspectus of the Geometry Control Method of the Whole-Procedure of Long-Span Cable-Stayed Bridge and Application[M]. Chengdu: Southwest Jiaotong University Press,2009.
[20]  谢明志. 特大跨度混合梁斜拉桥全过程监控中的误差控制[D]. 成都: 西南交通大学, 2011.
[21]  Xie Mingzhi. Error-Control of Whole-Procedure Construction Control in Super Long-Span Hybrid Girder Cable-Stayed Bridge[D].Chengdu: Southwest Jiaotong University,2011.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133