Yang Yuangui.The Compaction Mechanism of Asphalt Pavement [C]/ / Highway Society of Hainan Province Academic Papers.Haikou: Hainan Highway and Transportation Society,2007: 73-76.
[7]
JTJ 052—2000 公路工程沥青及沥青混合料试验规程[S].北京: 人民交通出版社,2000
[8]
JTJ 052—2000 Highway Engineering Asphalt and Asphalt Mixture Test Procedures[S].Beijing: China Communications Press,2000.
Yin Rujun,Li Yuting,Zhang Zhanjun.Measure and analysis of time available for asphalt mixture compaction [J].Highway,2001( 2):37-40.
[11]
郎立新.沥青混合料有效压实时间与温度的关系分析[J].黑龙江科技信息,2010( 8):220.
[12]
Lang Lixin.Analysis of relationship between compaction time and temperature for asphalt mixture [J].Scientific and Technical Information in Heilongjiang,2010( 8):220.
[13]
DB 32 /T 1246—2008 Technical Specification for Construction of Highway Asphalt Pavement in Jiangsu Provinc[S].Nanjing: Jiangsu Traffic Engineering Construction Bureau,2008.
[14]
张春燕,马其华.沥青混合料路面碾压工艺的分析与研究[J].施工技术,2005( 8):5-67.
[15]
Zhang Chunyan,Ma Qihua.Analysis and research of rolling technology for asphalt mixture pavement [J].Construction Technology,2005( 8):65-67.
[16]
DB 32 /T 1246—2008 江苏省高速公路沥青路面施工技术规范 [S].南京: 江苏省交通工程建设局,2008.
Li Hanguang,Gao Ying,Yu Wenbin.Compaction characteristics of hot mixed asphalt and number of roller passes [J].Journal of Southeast University: Natural Science,2011,41( 1):186-189.