Wang Xiaotong.Prestressed concrete box girder temperature field calculation by the finite element method [J].Journal of Southwest Jiaotong University,1985,3( 3):52-61.
Cao Fahui.The Construction Control of Cable-Stayed Bridge Temperature Effect [D].Chengdu: Civil Engineering College,Southwest Jiaotong University,2004: 40-45.
[7]
章熙民.传热学[M].北京: 中国建筑工业出版社, 1993: 81-90. Zhang Ximin.Heat Transfer [M].Beijing: China Building Industry Press,1993: 81-90.
Zheng Wenfu.Study on Prestressed Concrete Box Bridge Sunlight Temperature Field and Temperature Stress [D].Chengdu: Civil Engineering College,Southwest Jiaotong University,1988: 15-25.
Guo Jian.Concrete girder of cable-stayed bridge with non steady state temperature field and stress field analysis [J].China Journal of Highway and Transport,2005,18( 2):65-68.
Li Linjian,Tang Boming,Wei Gang,et al.Based on the variation principle of energy of the double plate layer temperature stress calculation [J].Journal of Chongqing Jiaotong University: Natural Science,2008,27( 4):555-557.
[14]
JTG D 62—2004 公路钢筋混凝土及预应力混凝土桥涵设计规 范[S].北京: 人民交通出版社,2 004: 10-11.
[15]
JTG D 60—2004 General Code for Design of Highway [S].Beijing: China Communications Press,2004: 10-11.