Wang Jianping,He Zhenjun,Liu Liangjun.Experimental study on hydraulic model of spillway optimization in Dalong key water control project[J].North China Water Resources and Electric Power Journal,2009,30( 3) : 25-28.
Fu Xuhui,Yang Shengfa,Liu Liangjun,et al.Hydraulic model test and study about Yangtoupu hydropower station[J].Small Hydropower Press,2008,139( 1) : 11-14.
Hu Pengfei,Yuan Guandong.Experimental research on form optimization for guide wall near the spillway entrance channel of Liujiagou Hydropower Project[J].Jilin Water Resources,2011 ( 1 ) : 25-27.
Hu Peng,Hu Jiang.Hydraulic model test of spillway in Zhongzuipo hydroelectric power projects[J].Journal of Chongqing Jiaotong University: Natural Science,2010,29( 5) : 813-815.
[14]
DL /T 5166—2002 溢洪道设计规范[S].北京: 中国电力出版 社,2 002.
[15]
DL /T 5166—2002 Spillway Design Code [S].Beijing: China Power Press,2002.