Wei Liangwen,Zhang Qinghe,Deng Zhongyi.Research on mechanism and application of face stability in large slurry shield tunneling [J].Chinese Journal of Underground Space and Engineering, 2007,3( 1) : 87-91.
Wei Liangwen,Zhang Qinghe,Sun Tongli,et al.Current research state of face stability in shield tunnelling and future development [J].Journal of Chongqing Jiaotong University: Natural Science, 2007,26( 6) : 67-72.
[4]
王成.隧道工程[M].北京: 人民交通出版社, 2009.
[5]
Wang Cheng.Tunnel Engineering [M].Beijing: China Communications Press,2009.
Zhou Xingren,Wang Feilong.Safety and risk assessment in Rivercrossing shield tunnel construction[J].Journal of Changsha Railway University: Social Science,2010,11( 6) : 189-192.
Zhang Zhibo.Risks analysis on large slurry shield tunnel construction in Nanjing Yangtze River tunnel and the counter measures[J]. Exploration Engineering: Rock & Soil Drilling and Tunneling, 2011,38( 6) : 65-69.
Xie Zhuang,Yang Junsheng,Liang Xinquan.Spheroidal weathering body subway shield tunnel construction risk analysis and response measures[J].Mining Technology,2010,10( 4) : 58-60.
[12]
Qu Jili,Ge Xiurun.Research on characteristics of the lateral settlement trough caused by shield construction[J].Journal of Shanghai Jiaotong University,2006,E11( 4) : 525-530.