Hou Fujin, Lu Jian, Li Jun. Research on variable weight synthesizing evaluation method to bridge durability [J]. Journal of Highway and Transportation Research and Development,2010,27(9):67-70.
[11]
Wang Chunsheng, Zhou Jiang, Wu Quanyou, et al. Fatigue life and service safety assessment for existing concrete bridges [J]. China Journal of Highway and Transport,2012,25(6):101-107.
[12]
Sun Ma, Liu Qingyang, Xiang Chenglong. Comprehensive evaluation index system of bridge preventive maintenance [J]. Journal of Chongqing Jiaotong University: Natural Science,2013,32(S1):899-902.
Guo Yan, Li Nan, Li Xingsen. Multi-mode multiple resources leveling and multi-objective particle swarm optimization with dynamic opulation [J]. Control and Decision,2013,28(1):131-136.
Hou Zhirong, Lv Zhensu. Particle swarm optimization with application based on MATLAB [J].Computer Simulation,2003,20(10):68-70.
[17]
Zhang Jinquan, Su Jian, Cheng Shoushan, et al. The Concrete Bridge Material Condition and Durability Detection and Evaluation Guidelines and Project [M].Beijing: China Communications Press, 2007.
Wang Wei, Zhang Chunxia, Qiao Guodong. Study on the post evaluation maintenance based on grey system of bridge preventive fuzzy synthetic evaluation [J]. Highway,2014(1):153- 157.
Wang Yuqian, Chen Ai’rong. Cost constitution and parameter analysis in computation period for bridge engineering considering decision makers’ objectives [J]. Journal of Highway and Transportation Research and Development,2012,29(1):97-103.
Bian Jingmei, Liang Jinguo, Yao Weijing. The application of reliability degradation model in bridge repair in decision making [J]. Journal of China & Foreign Highway,2010,30(6):164-168.
[24]
Zhang Chunxia, Wang Wei. Timing of the bridge preventive maintenance by the optimization methods [J]. Highway,2013(7):259-262.
[25]
[8] 张霞.混凝土桥梁预防性养护体系研究[D].西安:长安大学,2012.
[26]
Zhang Xia. Research on Preventive Maintenance System of Concrete Bridge [D]. Xi’an: Chang’an University, 2012.