Xiang Yiqiang,Yi Shaoping,Du Xiaoqing.Study on the full scale segmental model of tower of cable-stayed bridge of the second Yangtze river bridge in Nanjing[J] .China Civil Engineering Journal,2000,33(1):15-22.
Liu Zhao,Meng Shaop ing,Lv Zhitao.Model tests and comparative study of the pylon’s anchorage zone of two long-span cable-stayed bridges[J] .Engineering Science,2003,5(12):48-54.
[5]
Tao Qiyu.Study on Key Issues in the PC Pylon of Long-Span CableStayed Bridge[D] .Chengdu:Southwest Jiaotong University,2012.
Zhong Jiwei,Huang Zhanjun,Wang Bo,et al.Study of full scale model test for asymmetric anchor zone in pylon of cable-stayed bridge with twist plane back stays[J] .World Bridges,2011(4):45-48.
[8]
刘世建.#字型预应力体系在索塔锚固区的应用及试验研究[D] .重庆:重庆交通大学,2008.
[9]
Liu Shijian.Theoretical Calculation and Experimental Analysis of“#”Type Prestressed System the Cable Tower Anchorage Zone of Cable-Stayed Bridge[D] .Chongqing:Chongqing Jiaotong University,2008.
[10]
叶华文,强士中.厦门马新大桥索塔锚固区受力性能试验研究报告[R] .成都:西南交通大学,2012.
[11]
白光亮.大跨度斜拉桥索塔锚固区结构行为与模型试验研究[D] .成都:西南交通大学,2009.
[12]
Bai Guangliang.Study on the Structural Behaviors and Experiments of Anchorage Zone of Cable-Stayed Bridge[D] .Chengdu:Southwest Jiaotong Universtiy,2009.
Su Qingtian,Qin Fei.Theory and experiment on horizontal mechanical behavior in anchorage zone of composite cable-pylon[J] .Journal of Tongji University:Natural Science,2011,39(8):1120-1125.
Di Jin,Zhou Xuhong,You Jinlan,et al.Mechanical property of cable-pylon anchorage zone of cable-stayed bridge with steel box girder[J] .China Journal of Highway and Transport,2007,20(4):48-52.
Liu Zhaofeng,Meng Xin,Zhao Renda,et al.Full-scale model test for pylon segment of Changshou Yangtse River highway bridge[J] .Journal of Highway and Transportation Research and Development,2009,26(8):77-83.
[23]
Ye Huawen,Qiang Shizhong.Test of Anchorage Zone of Maxin Bridge in Xiamen[R] .Chengdu:Southwest Jiaotong Universtiy,2012.
[24]
Liu Dejun,Xu Yaguang,Li Xiaozhen,et al.Segmental model test of studies of composite cable-tower anchor zone of cable-stayed bridge[J] .Steel Constructure,2009,24(9):14-21.