Ding Wenqi,Wang Xiaoxing,Li Zhigang,et al.Optimal analysis of construction schemes for shallow large span Longshan twin tunnel[J]. Chinese Journal of Rock Mechanics and Engineering ,2005,24(22):4042-4047.
Jia Yonggang, Wang Mingnian, Deng Dunyi,Study on construction mechanics of two kinds of construction methods for double-arch tunnel[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(A2):5727-5732.
[5]
李俊,李泳伸,王志杰,等.双联隧道开挖技术探讨[J].现代隧道技术,2003(4):20-24.
[6]
Li Jun,Li Yongshen,Wang Zhijie,et al.Technology of double tunneling[J].Modern Tunneling Technology , 2003(4):20-24.
[7]
贺维国,胡慧.浅埋暗挖大跨度双联拱隧道的设计[J].隧道建设,2005,25(B6):28-31.
[8]
He Weiguo , Hu Hui. Design of shallow excavation span double-arch tunnel[J].Tunel Construction, 2005,25(B6):28-31.
[9]
李围.ANSYS土木工程应用实例[M].北京:中国水利水电出版社,2007.
[10]
Li Wei. ANSYS in Civil Engineering Application Examples[M] Beijing: China Water Power Press,2007 .
Zhou Jiankun,Li Zhihong. Numerical analysis on deformation effect of metro tunnels due to adjacent excavation project[J].Chinese Journal of Underground Space and Engineering , 2010,6(A1):1398-1403.
[13]
Doege E, Bohnsack R. Closed die technologies for hot forging[J]. Journal of Material Processing Technology,2000,98(2):165-170.
[14]
JTG D70-2004《公路隧道设计规范》[C].北京:人民交通出版社,2004.
[15]
JTG D70-2004 Code for Design of Road Tunnel[C]. Beijing:China Communications Press,2004.
[16]
孙钧.地下工程设计理论与实践[M].上海:上海科学技术出版社,1996.
[17]
Sun Jun. Design Theory and Practice of Underground Engineering [M] Shanghai:Shanghai Science and Technology Press,1996. .