Huang Bishan, Zhang Xujin, Shu Ronglong, et al. Study on the flow conditions at the entrance area of shiplock approach channel in hydro-power station [J]. Journal of Chongqing Jiaotong University, 2003, 22(3):120-124.
Li Yan, Zheng Baoyou, Lu Wenlei, et al. Test on navigation condition influenced by the angle between approach channel and main channel [J]. Journal of Waterway and Harbor, 2009, 30(1): 42-48.
Wang Yunli, Liu Yang, Zhang Xujin. Report on Experience of Fixed Bed and Flood Model of Baishiyao Hydraulic Project [R]. Chongqing: The Southwest Waterway Engineering Institute, 2012.
[6]
JTJ 305—2001船闸总体设计规范[S]. 北京:人民交通出版社,2001.
[7]
JTJ 305—2001 Code for Master Design of Shiplocks [S]. Beijing: China Communications Press, 2001.
[8]
JTJ 312—2003 航道整治工程技术规范[S]. 北京:人民交通出版社,2003.
[9]
JTJ 312—2003 Technical Code of Regulation Works for Navigation Channel [S]. Beijing: China Communications Press, 2003.
Zhao Zhizhou, Xu Hong, Peng Kai. On arrangement of downstream approach channel and navigation condition in the entrance area of Yinpan power station on the Wujiang River [J]. Port and Waterway Engineering, 2008(3): 82-86.
[12]
赵健.富金坝枢纽船闸引航道布置及通航条件研究[D].重庆:重庆交通大学,2009.
[13]
Zhao Jian. Research on Layout for the Approach Channel of Ship Lock and Navigation Conditions in Fujinba Junction [D]. Chongqing: Chongqing Jiaotong University, 2009.
[14]
谭先泽,郝岭,吴文凤.山区河流船闸引航道布置型式[J].水运工程,2006(4):69-72.
[15]
Tan Xianze, Hao Ling, Wu Wenfeng. Arrangement of ship lock approach channel in mountainous rivers [J]. Port and Waterway Engineering, 2006(4): 69-72.