全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

桥梁抗倒塌能力鲁棒性设计研究

DOI: 10.3969/j.issn.1674-0696.2014.01.01, PP. 1-7

Keywords: 桥梁,设计,垮塌,鲁棒性,bridge,design,collapse,robustness

Full-Text   Cite this paper   Add to My Lib

Abstract:

:?从设计人员的认识水平和设计责任等方面分析了桥梁事故中存在的人为因素。通过吸取已有桥梁事故的经验教训,从结构方案和构造措施两方面对如何提高桥梁的抗倒塌能力、保证桥梁的整体牢固性(即鲁棒性)提出了若干设计建议。研究对提高桥梁的抗倒塌能力、帮助设计人员增强桥梁设计中的安全防范意识具有很好的实际指导价值。

References

[1]  陈宜言,汤国栋,廖光明,等. 拱式桥梁破损安全吊杆及其系统研究[J]. 四川大学学报: 工程科学版,2008,40( 1) : 44-50.
[2]  Chen Yiyan,Tang Guodong,Liao Guangming et al. Study on failure safety suspender systems of arch bridges[J]. Journal of Sichuan University:Engineering Science Edition, 2008,40( 1) : 44-50.
[3]  Recommendations for Stay Cable Design,Testing and Installation[S]. 5th ed. Farmington Hills: Cable-Stayed Bridges Committee,Post-Tensioning Institute ( PTI) ,2007.
[4]  JTG/T D 65-01—2007 公路斜拉桥设计细则[S]. 北京: 人民交通出版社,2007.
[5]  JTG/T D 65-01—2007 Guidelines for Design of Highway cable—stayed Bridges[S]. Beijing: China Communications Press,2007.
[6]  Starossek U. Progressive Collapse of Bridges———Aspects of Analysis and Design [R]. Mokpo,Korea: Invited Lecture,Proceedings, International Symposium on Sea-Crossing Long-Span Bridges, 2006.
[7]  黄龙田,李载宁. 某独柱式匝道弯桥病害分析和加固改造[J].城市道桥与防洪,2011,2: 60-62.
[8]  Huang Longtian,Li Zaining. Fault analysis and reinforcing reconstruction of a single-column ramp curved bridge [J]. Urban Roads Bridges & Flood Control,2011,2: 60-62.
[9]  Scheer J.Failed Bridges———Case Studies,Causes and Consequences[M].Berlin,Germany: Wilhelm Ernst & Sohn,2010.
[10]  Akesson B. Understanding Bridge Collapse[M].London,U K: Taylor& Frances Group, 2008.
[11]  GSA.Progressive Collapse Analysis and Design Guidelines for New Federal Office Buildings and Major Modernization Projects [S].Washington,D.C.: General Services Administration,2003.
[12]  USDOD.Unified Facilities Criteria: Design of Buildings to Resist Progressive Collapse [S].Washington,D.C. : United States Department of Defense,2005.
[13]  日本钢结构协会和美国高层建筑和城市住宅理事会. 高冗余度钢结构倒塌控制设计指南[M].陈以一,赵宪忠,译. 上海:同济大学出版社,2007.
[14]  Japanese Society of Steel Construction,Council on Tall Buildings and Urban Habitat. Guidelines for Collapse Control Design: Construction of Steel Buildings with High Redundancy [M].ChenYiyi,Zhao Xianzhong,translation. Shanghai: Tongji University Press, 2007.
[15]  EN1991-1-7 Eurocode 1.Actions on Structures,Part 1-7: General Actions-Accidental Actions [S].Brussels: European Committee for Standardization, 2005.
[16]  The Building Regulations [S]. U K: Her Majesty’s Stationary Office,1992.
[17]  ISO2394 General Principles on Reliability for Structures[S]. Switzerland:The International Organization for Standardization,1998.
[18]  黄冀卓,王湛. 钢框架结构鲁棒性评估方法[J].土木工程学报,2012,45( 9) : 46-54.
[19]  Huang Jizhuo,Wang Zhan. An approach for evaluation of the structural robustness of steel frames [J].China Civil Engineering Journal,2012, 45( 9) : 46-54.
[20]  汤国栋,王竹,廖光明,等. 桥梁结构的鲁棒性[J].预应力技术,2011( 1) : 10-13.
[21]  Tang Goudong,Wang Zhu,Liao Guangming,et al. Robustness of bridges [J].Expressing Techniques,2011 ( 1) : 10-13.
[22]  GB 50923———2013 钢管混凝土拱桥技术规范[S]. 北京: 中国计划出版社,2013.
[23]  GB 50923———2013 Technical code for concrete-filled steel Tube Arch Bridges[S].Beijing: China Planning Press,2013.
[24]  彭桂瀚,袁保星,陈宝春. 加设钢管桁架纵梁改造中承式拱桥悬挂桥道系的应用研究[J].公路工程,2009,34( 3) : 109-114.
[25]  Peng Guihan,Yuan Baoxing,Chen Baochun.Research on strengthening suspended deck system for half - through arch bridge by setting longitudinal steel - tubular trusses [J].Highway Engineering,2009,34( 3) : 109-114.
[26]  范立础. 桥梁工程安全性与耐久性———展望设计理念进展[J].上海公路,2004,91( 1) : 1-7.
[27]  Fan Lichu. Safety and durability of bridge engineering—progress of design concept in prospect [J]. Shanghai Highways,2004,91( 1) :1-7.
[28]  Starossek U. Typology of progressive collapse [J]. Engineering Structures, 2007, 29( 9) : 2302-2307.
[29]  汤国栋,陈宜言,姜瑞娟,等. 桥梁破损安全拉索及其系统研究[J]. 四川大学学报: 工程科学版, 2007,39( 6) : 14-20.
[30]  Tang Guodong,Chen Yiyan, Jiang Ruijuan,et al. Study on failure safety cable systems of bridges [J]. Journal of Sichuan University:Engineering Science Edition,2007, 39( 6) : 14-20.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133