Huang Teng,Zhang Shufeng,Zhang Dengjing,et al.Construction control technology for large span prestressed concrete continuous beams [J].Journal of Hohai University:Natural Science,2003,31(6):669-673.
Wang Jian,Fang Zhi.Long-span prestressed concrete continuous bridge construction control research [J].Journal of Hunan University:Natural Science,2003,30(3):130-133.
Zhao Wenwu,Xin Kegui.Self-adaptive construction control analysis of pre-stressed concrete cable-stayed bridge [J].Engineering Mechanics,2006,23(2):78-83.
Zhang Longhai,Huang Peng,Tian Weixiong,et al.Analysis of parameters for long-span continuous bridges based on neural network and genetic algorithms [J].Journal of Highway and Transportation Research and Development,2007,27(4):86-90.
Sun Quansheng,Cui Wentao.Long-span prestressed concrete continuous bridge construction control based on the gray prediction mode [J].China Safety Science Journal,2008,18(11):164-168.
Hao Zhiqiang,Xie Hailong.The gray system theory application on the construction of the Renyihe great bridge [J].Shanxi Architecture,2003,29(9):122-123.
Yu Tianlai,Chen Wuquan.The application of grey system theory on the elevation monitoring of continuous rigid frame prestressed concrete bridge [J].Journal of China & Foreign Highway 2008,28(3):118-120.
Wu Yi,Bi Lei,Qu Hongfei,et al.Construction control study on the prestressed concrete continuous bridge based on the gray system theory [J].Special Structure,2009,26(3):83-86.
Li Guoping,Liu Jian.The theory and method on the line-shape optimism control of the long-span continuous bridge [J].East China Highway,1992,75(2):66-70.