Liang Yingchen.The Examination of the technical design of the navigation construction in the Three Gorges Project [J].Engineering Sciences,2000,2(5):34-43.
[2]
Hu Ya’an,Li Zhonghua.Key Hydraulic Research of Ship Chamber and Approach Channel of the TGP Ship Lift [R].Nanjing:Nanjing Hydraulic Research Institute,2011.
Qiao Wenquan,Li Dingfang,Dong Fenglin.Navigation Conditions and Layout of Downstream Approach Channel of the Three Gorge Project [R].Nanjing:Nanjing Hydraulic Research Institute,1990.
Cai Ruzhe,Chen Min,Cai Chuang,et al.Ship model test research on navigation of the Three Gorges Electricity Station between two dams at peak regulation in flood season [J].Journal of Chongqing Jiaotong University:Natural Science,2010,29(4):632-635.
Li Yan,Meng Xiangwei,Li Jinghe,et al.Navigation conditions of downstream approach channel of the Three Gorge Project [J].Journal of Waterway and Harbor,2003,24(3):121-125.
Zhao Zhizhou,Wang Duoyin,Xu Hong,et al.Study of navigation condition in the entrance area of approach channel of hydro-complexion Wujiang River [J].Journal of Chongqing Jiaotong University:Natural science,2008,27(5):812-815.
[11]
[8]须清华,张瑞凯.通航建筑物应用基础研究[M].北京:中国水利水电出版社,1999.
[12]
Xu Qinghua,Zhang Ruikai.Basic and Applied Research of Navigation Structure [M].Beijing:China Water Power Press,1999.
[13]
[1]梁应辰.三峡工程通航建筑物技术设计审查[J].中国工程科学,2000,2(5):34-43.
[14]
[2]宋维邦.长江三峡水利枢纽通航建筑设计[J].中国三峡建设,1995(3):10-47.
[15]
Song Weibang.Design of navigation structures of Three Gorges Project [J].China Three Gorges Construction,1995(3):10-47.