Li Shucai,Li Shuchen,Zhang Qingsong,et al.Forecast of karst fractured ground water and defective geological conditions [J].Chinese Journal of Rock Mechanics and Engineering,2007,26(2):217-215.
Zhong Shihang,Sun Hongzhi,Li Shucai,et al.Detection and forecasting for hidden danger of karst fissure water and other geological disasters during construction of tunnels and underground projects [J].Chinese Journal of Rock Mechanics and Engineering,2012,31(Sup1):3298-3327.
Zuo Changqun,Lv Qiaosen,Huang Bin.Fuzzy optimization and its application of geologic prediction methods in tunnel construction[J].Journal of Chongqing Jiaotong University:Natural Science,2012,31(5):948-952.
[12]
Zhong Shihang,Sun Hongzhi,Wang Rong,et al.Progress of geology forecasting ahead of tunnel face by means of geophysical technology[J].Tunnel Construction,2007,27(1):7-9.
Harry M J.Ground Penetrating Radar:Theory and Applications [M].Beijing:Publishing House of Electronics Industry,2011.
[18]
Arkhipov V I.Hierarchy of dielectric-relaxation times in water [J].Journal of Non-Crystalline Solids,2002,305(1/2/3):127-135.
[19]
Annan A P.Ground Penetrating Radar:Workshop Notes[M].Ontario,Canada:Sensors & Software Inc.,1999.
[20]
Topp G C,Yanuka M,Zebchuk W D,et al.Determination of electrical conductivity using time domain reflectometry:soil and water experiments in coaxial lines[J].Water Resources Research,1988,24(7):945-952.