[3] Lee H L. A multi-echelon inventory model for repairable items with emergency lateral transshipments[J]. Management Science, 1987, 33(10): 1302-1316.
[2]
[4] Al-Rifai M H, Rossetti M D. An efficient heuristic optimization algorithm for a two-echelon (R, Q) inventory system[J]. International Journal of Production Economics, 2007,(109): 195-213.
[7] Archibald T W, Black D, Glazebrook K D. An index heuristic for transshipment decisions in multi-location inventory systems based on a pairwise decomposition[J]. European Journal of Operational Research, 2009,192(3): 69-78.
[5]
[9] Saranga H, Kumar U D. Optimization of aircraft maintenance support infrastructure using genetic algorithms-level of repair analysis[J]. Ann Oper Res, 2006, 143(1): 91-106.
[6]
[14] Sherbrooke C C. Optimal inventory modeling of system: multi-echelon techniques[M]. 2nd ed. Boston: Artech House, 2004.
[2] Sherbrooke C C. Vari-metric: improved approximations for multi-indenture multi-echelon availability models[J]. Operations Research, 1986,(34): 311-319.
[10]
[6] Kilpi J, Toyli J, Vepsalainen A. Cooperative strategies for the availability service of repairable aircraft components[J]. International Journal of Production Economics, 2009, 117(2): 360-370.
[11]
[8] Wu M C, Hsu Y K. Design of BOM configuration for reducing spare parts logistic costs[J]. Expert Systems with Applications, 2008,34(1): 2417-2423.
[11] Lee J Y, Schwarz L B. Leadtime management in a periodic-review inventory system: a state-dependent base-stock policy[J]. European Journal of Operational Research, 2009,199: 122-129.
[14]
[12] Sleptchenko A, van der Heijden M C, van Harten A. Effects of finite repair capacity in multi-echelon, multi-indenture service part supply systems[J]. International Journal of Production Economics, 2002,79: 209-230.