[12] Pritsker A A.GERT graphical evaluation and review technique[M].Santa Monica:Rand Corporation,1966.
[13]
[13] Whitehouse G E. Systems analysis and design using network techniques[M]. Englewood Cliffs:Prentice-Hall,1973:243-250.
[14]
[14] Nicolai W. On the temporal analysis of special GERT networks using a modified Markov renewal process[J]. Zeitschrift für Operations Research, 1980, 24(7): 263-272.
[15]
[15] Singh H R, Shankar G. GERT analysis of two-stage attribute sampling plans based on an exponential failure model[J]. Microelectronics Reliability, 1988, 28(2): 319-321.
[16]
[16] Zimmermann J. Time complexity of single-and identical parallel-machine scheduling with GERT network precedence constraints[J]. Mathematical Methods of Operations Research, 1999, 49(2): 221-238.
[18] Jewell A, Wigge M A, Gagnon C M, et al. USS nimitz and carrier airwing nine surge demonstration,ADA362472 [R]. Alexandria:Center for Naval Analyses,1998.