Jaber M Y, Guiffrida A L. Learning curves for processes generating defects requiring reworks[J].European Journal of Operational Research,2004,159(3):663-672.
Pan J C H, Lo M C. The learning effect on setup cost reduction for mixture inventory models with variable lead time[J]. Asia-Pacific Journal of OperationalResearch,2008,25(4):513-529.
[9]
Hung T W, Chen Pingting. On the optimal replenishment in a finite planning horizon with learning effect of setup costs[J].Journal of Industrial and Management Optimization,2010,6(2): 425-433.
[10]
Tsai D M. An optimal production and shipment policy for a single-vendor single-buyer integrated system with both learning effect and deteriorating items[J].International Journal of Production Research,2011,49(3):903-922.
Mukhopadhyay S K, Yao Dongqing, Yue Xiaohang. Information sharing of value-adding retailer in a mixed channel hi-tech supply chain[J].Journal of Business Research,2008,61(9):950-958.
[13]
Dumrongsiri A, Fan Ming, Jain A, et al. A supply chain model with direct and retailer channels[J].European Journal of Operational Research,2008,187(3): 691-718.
Yue Xiaohang,Liu J. Demand forecast sharing in a dual-channel supply chain[J]. European Journal of Operational Research,2006,174(1):646-667.
[27]
Mukhopadhyay S,Zhu Xiaowei,Yue Xiaohang. Optimal contract design for mixed channels under information asymmetry[J].Production and Operations Management,2008,17(6): 641-650.
[28]
Hua Guowei,Wang Shouyang,Cheng T C E. Price and lead time decisions in dual-channel supply chains[J].European Journal of Operational Research,2010,205(1):113-126.
[29]
Bernstein F,Song Jingsheng,Zheng Xiaona. "Bricks-and-mortar" vs. "clicks-and-mortar":An equilibrium analysis [J].European Journal of Operational Research,2008,187(3):671-690.
[30]
Ofek E,Katona Z,Sarvary M."Bricks and clicks": The impact of product returns on the strategies of multi-channel retailers [J].Marketing Science,2011, 30(1):42-60.