Hahm J, Yano C A. The economic lot and delivery scheduling problem: the single itemcase [J]. International Journal of Production Economics, 1992, 28(2):235-252.
[2]
Kim S L, Ha D. A JIT lot-splitting model for supply chain management: enhancing buyer-supplierlinkage [J]. International Journal of Production Economics, 2003, 86(1):1-10.
[3]
Khouja M. Synchronization in supply chains: implications for design andmanagement [J].Journal of the operational Research Society, 2003, 54(9):984-994.
[4]
Kreng B, Wang I C. Economical delivery strategies of products in a JIT system under a global supply chain [J]. Int J Adv Manuf Technol, 2005,26:1421-1428.
[5]
Pundoor G, Chen Zhilong. Joint cyclic production and delivery scheduling in a two-stage supply chain[J]. International Journal of Production Economics, 2009,119(1) :55-74.
[6]
Low C, Li R K, Chang C M. Integrated scheduling of production and delivery with time windows[J]. International Journal of Production Research, forthcoming.
[7]
Lee W. A joint economic lot size model for raw material ordering, manufacturing setup, and finished goodsdelivering [J]. Omega, 2005, 33(2): 163-174.
[8]
Cao Wujun, Hu Yujin, Li Chenggang, et al. Single setup multiple delivery model of JIT system [J]. Int J Adv Manuf Technol, 2007, 33: 1222-1228.
[9]
Pundoor G. Integrated production-distribution scheduling in supplychains . Maryland: University of Maryland, 2005.
[10]
Sana S S. A production-inventory model of imperfect quality products in a three-layer supply chain[J]. Decision Support Systems, 2011, 50(2):539-547.
[11]
Ben-Daya M, As’ad R, Seliaman M. An integrated production inventory model with raw material replenishment considerations in a three layer supply chain[J]. International Journal of Production Economics, forth coming.