Gupta Y P. A feasibility study of JIT purchasing implementation in a manufacturing facility[J]. International Journal of Operations & Production,1990,20(1):31-41.
[2]
Golhar D Y, Sarker B R. Economic manufacturing quantity in a just-in-time delivery system[J]. Intornational Journal of Production Research, 1992,30(5):961-972.
[3]
Sarker R A, Khan L R. Optimal batch size for a production system operating under periodic delivery policy[J]. Compute Engineering, 1999,37(4):711-730.
[4]
Diponegoro A, Sarker B R. Determining manufacturing batch sizes for a lumpy delivery system with trend demand. Intemational Journal of Production Economics, 2002, 77 (2): 131- 143.
[5]
Nie Lanshun, Xu Xiaofe, Zhan Dechen. Incorporating transportation costs into JIT lot splitting decisions for coordinated supply chains[J]. Jaunal of Advanced Manufacturing Systerms, 2006, 5(1): 111-121.
[6]
Hans S, Ibrahim R N, Lochert P B. Joint economic lot size in distribution system with multiple shipment policy[J]. International Journal of Production Economics, 2006, 102(2): 302-316.
Caramanis C, Anli O M. Dynamic lead time modeling for JIT production planning[J]. Proceedings-IEEE International Conference on Robotics and Automation,1999, 2: 1450-1455.
[10]
Chiul H N, Huang H L. A multi-echelon integrated JIT inventory model using the time buffer and emergency borrowing policies to deal with random delivery lead times[J]. International Journal of Production Research, 2003,41(13):2911-2931.