Yung P, Lai L W C. Quality assurance in construction by independent experts: a case study of the efficiency performance of state-owned enterproses in china[J]. Environment and Planning B: Planning and Design, 2009, 36(4): 682- 697
[2]
Chen Weitong,Chen T T. Critical Success factors for construction partnering in Taiwan[J]. International Journal of Project Management, 2007, 25(5): 475-484.
[3]
Meng Xianhai. Assessment framework for construction supply chain relationships: development and evaluation[J]. International Journal of Project Management, 2010, 28(7): 695-707.
[4]
von Branconi C,Loch C H. Contracting for major projects: eight business levers for top management [J]. International Journal of Project Management, 2004, 22(2): 119-130.
Robbins S P, Judge T A. 组织行为学 [M].李原, 孙健敏, 译. 北京: 中国人民大学出版社, 2008.
[7]
Charness G,Kuhn P. Do co-workers’ wages matter? Theory and evidence on wage secrecy, wage compression and effort. IZA Discussion Paper, 2004.
[8]
Vanhoucke M,Debels D. The discrete time/cost trade-off problem: extensions and heuristic procedures [J]. Journal of Scheduling, 2007,(10): 311-326.
[9]
Eshtehardian E, Afshar A, Abbasnia R. Fuzzy-based MOGA approach to stochastic time-cost trade-off problem [J]. Automation in Construction, 2009, 18(5): 692-701.
[10]
Pollack-Johnson B, Liberatore M J. Incorporating quality considerations Into project time/cost tradeoff analysis and decision making [J]. IEEE Transactions on Engineering Management, 2006, 53(4): 534-542.
[11]
Lam K C, Ng S T. A cooperative Internet-facilitated quality management environment for construction [J]. Automation in Construction, 2006, 15(1): 1-11.
[12]
Chan W K L,Wong F K W, Scott D. Managing construction projects in China-the transitional period in the millennium[J]. International Journal of Project Management, 1999, 17(4): 257-263.
[13]
Zheng D X M, Ng S T, Kumaraswamy M M. Applying a genetic algorithm-based multiobjective approach for time-cost optimization [J]. Journal of Construction Engineering and Management, 2004, 130(2): 168-176.
[14]
Tareghian H R,Taheri H. An application of randomized minimum cut to the project time/cost tradeoff problem [J]. Applied Mathematics and Computation, 2006, 173(2): 1200-1207.
Itoh H. Moral hazard and other regarding preferences[J]. The Japanese Economic Review, 2004, 55(1): 18-25.
[18]
Dur R, Glazer A. Optimal contracts when a worker envies his boss [J]. The Journal of Law, Economics & Organization, 2008, 24(1): 120-137.
[19]
Crouch M. Investment under RPI-X: practical experience with an incentive compatible approach in the GB electricity distribution sector [J]. Utilities Policy, 2006, 14(4): 240-244.
[20]
Fehr E, Schmidt K M. A theory of fairness, competition, and cooperation [J]. The Quarterly Journal of Economics, 1999, 114: 817-868.
[21]
Merton R C. Optimum consumption and portfolio rules in a continuous-time model [J]. Journal of Economic Theory, 1971, 3(4): 373-413.