全部 标题 作者
关键词 摘要

OALib Journal期刊
ISSN: 2333-9721
费用:99美元

查看量下载量

相关文章

更多...

可变产能的按订单装配系统库存和生产决策研究

, PP. 94-103

Keywords: 按订单装配系统,可变产能,不确定需求,提前装配

Full-Text   Cite this paper   Add to My Lib

Abstract:

?本文基于一个ATO生产商的实践,考虑一个需求不确定并具有子装配件的单周期ATO系统,为了应对较长的采购提前期和有限产能的挑战,生产商可以在得到确定的需求之前提前采购零件,装配子装配件以至于最终产品。由于产品物料清单结构中存在子装配件作为可选的中间件,因此完全使用零件和使用子装配件装配最终产品的不同,造成装配能力在时间上具有可变性。我们对此问题建立了利润最大化模型,分析在上述ATO环境中的最优库存和生产决策。通过一系列最优解的性质,我们得到了该问题的有效解决方法。

References

[1]  Song Jingsheng, Yao D D.Performance analysis and optimization of assemble-to-order systems with random lead-times [J].Operations Research, 2002, 50: 889-903.
[2]  Cheung K L, Hausman W.Multiple failures in a multi-item spare inventory model [J].IIE Transactions, 1995, 27: 171-180.
[3]  Gurnani H, Akella R, Lehoczky J.Optimal order policies in assembly systems with random demand and random supplier delivery [J].IIE Transactions, 1996, 28: 865-878.
[4]  Yano C.Stochastic lead times in two-level assembly systems [J].IIE Transactions, 1987, 19: 371-378.
[5]  Song Jingsheng, Yano C A, Lerssrisutiya P.Contract assembly: dealing with combined supply lead time and demand quantity uncertainty [J].Manufacturing and Servic Operations Management, 2000, 2: 287-296.
[6]  Rudi N.Dual sourcing: combining make-to-stock and assemble-to-order.Paper Working, University of Rochester, 2000.
[7]  Hsu V N, Lee C Y, So K C.Optimal component stocking policy for assemble-to-order systems with lead time-dependent component and product pricing[J].Management Science, 2006, 52(3): 337-351.
[8]  Swaminathan J M, Tayur S R.Managing broader product lines through delayed differentiation using vanilla boxes [J].Management Science, 1998, 44: 161-172.
[9]  Fu Ke, Hsu V N, Lee C Y.Inventory and production decisions for an assemble-to-order system with uncertain demand and limited assembly capacity [J].Operation Research, 2006, 54: 1137-1150.
[10]  Eynan A, Rosenblatt M J.Assemble to order and assemble in advance in a single-period stochastic environment [J].Naval Research Logistics, 1995, 42: 861-872. 3.0.CO;2-X target="_blank">
[11]  Hariga M.A single-period, multi-echelon stochastic model under a mix of assemble to order and assemble in advance policies [J].Naval Research Logistics, 1998, 45: 599-614. 3.0.CO;2-Y target="_blank">
[12]  肖勇波, 陈剑, 吴鹏.产能和需求不确定情形下ATO 系统最优库存和生产决策研究 [J].中国管理科学, 2007, 15(5):56-64. 浏览
[13]  Fu Ke, Hsu V N, Lee C Y.Optimal component acquisition for an assemble-to-order system with expediting [J].Manufacturing and Service Operations Management, 2009, 11: 229-236.
[14]  Xiao Yongbo, Chen Jian, Lee C Y.Optimal decisions for assemble-to-order systems with uncertain assembly capacity [J].International Journal of Production Economics, 2010, 123: 155-165.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133