混凝土斜拉桥施工阶段的体系可靠度

, PP. 53-58

Keywords: 桥梁工程,斜拉桥,改进的β约界法,体系可靠度,施工期,早龄期,失效模式

Full-Text   Cite this paper   Add to My Lib

Abstract:

?针对斜拉桥失效路径繁多的问题,采用改进的β约界法限制分枝规模,寻找并识别对结构体系可靠度起主导作用的主要失效模式。通过现场试验建立了高强度混凝土早龄期力学性能的经时概率模型。同时,考虑各主要失效模式间的相关性,提出了计算体系失效概率上下界的实用方法。通过一座双塔斜拉桥施工期体系可靠度的计算实例表明了这一方法的有效性。研究成果对于评价混凝土斜拉桥施工期的结构整体性能和安全程度具有参考价值。

References

[1]  董 聪, 夏人伟.现代结构系统可靠性评估理论研究进展[J].力学进展, 1995, 25(4):537-547.
[2]  董 聪.现代结构系统可靠性理论及其应用[M].北京:科学出版社, 2001:186-225.
[3]  MUROTSU Y, OKADA H, TAGUCHI K, et al.Automatic Generation of Stochastically Dominant Modes of Structural Failure in Frame Structures[J].Structural Safety, 1984, 2(1):17-25.
[4]  LIU Tian-yun, ZHAO Guo-fan.An Effective Algorithm for Identifying Structural Dominant Failure Modes[J].Journal of Dalian University of Technology, 1998, 38(1):97-100.
[5]  LIU Tian-yun, LU Ke-shun, ZHAO Guo-fan.Reliability Analysis of Reinforced Concrete Frames[J].Journal of Dalian University of Technology, 1998, 38(2):223-227.
[6]  VANMARKE E H.Matrix Formulation of Reliability Analysis and Reliability-Based Design[J].Computers and Structures, 1971, 13(13):757-770.
[7]  ANG A H S, MA H F.On the Reliability of Structural Systems[C]//ICOSSAR.Proceedings of the 3rd International Conference on Structural Safety and Reliability.Trondheim:ICOSSAR, 1981:295-314.
[8]  LI Yun-gui, ZHAO Guo-fan.An Approximate Method for Structural System Reliability Analysis[J].China Civil Engineering Journal, 1993, 26(5):70-76.
[9]  CHO H N, LIM J K, PARK K H.System Reliability and System Reliability-Based Carrying Capacity Evaluation of Cable-Stayed Bridges[C]//ICOSSAR.Proceedings of the 7th International Conference on Structural Safety and Reliability.Kyoto:Kyoto University, 1997:1 927-1 934.
[10]  LU Ying-zhao, HE Shuan-hai.Fuzzy Reliability Evaluation of Defective RC Beam Bridge[J].Journal of Traffic and Transportation Engineering, 2005, 5(4):58-62.
[11]  HE Shuan-hai, LU Ying-zhao.Reliability Research of Existing Reinforced Concrete Structures[J].Journal of Architecture and Civil Engineering, 2005, 22(1):71-75.
[12]  WANG Yuan-qing, ZHANG Yong, SHI Yong-jiu, et al.Analysis of Load Capacity of New-Style Joints Between Cable and Concrete-Filled Steel Tube Arch Bridge[J].Journal of Architecture and Civil Engineering, 2005, 22(3):55-58.
[13]  ZHOU Mi, SONG Yi-fan, ZHAO Xiao-xing.Control Technique for Construction of Pre-stressed-Concrete Cantilever Casting Bridge[J].Journal of Chang'an University:Natural Science Edition, 2005, 25(6):43-48.
[14]  WANG Yi, YE Jian-shu, GU Xiang-feng.Influence of Horizontal Curvature of Prestressing Tendon in Transverse Beams on Concrete Cable-Stayed Bridge Inclined Web[J].Journal of Traffic and Transportation Engineering, 2005, 5(2):51-55.
[15]  HE Shuan-hai, REN Wei, ZHAO Xiao-xing.Experiments of Shear Capacity of RC Beam Bridges Rehabilitated with CFRP Under Loading Case[J].Journal of Chang'an University:Natural Science Edition, 2004, 24(1):34-39.
[16]  LIU Yang, ZHANG Jian-ren, LI Chuan-xi.Calculation of Time-Variant Reliability for Concrete Cable-Stayed Bridges During Construction[J].China Journal of Highway and Transport, 2004, 17(3):31-35.
[17]  LI Yang-hai, BAO Wei-gang.Structural Reliability and Probability Limit State Design of Highway Bridges[M].Beijing:China Communications Press, 1997.
[18]  THOFT-CHRISTENSEN P, SORENSEN J D.Reliability of Structural Systems with Correlated Elements[J].Applied Mathematical Modeling, 1982, 6(3):171-178.
[19]  DONG Cong, XIA Ren-wei.Advances in the Reliability Evaluation Theory of Structural Systems[J].Advances in Mechanics, 1995, 25(4):537-547.
[20]  DONG Cong.Reliability Theory of Modern Structural Systems and Its Application[M].Beijing:Science Press, 2001:186-225.
[21]  刘天云, 赵国藩.一种识别结构主要失效模式的有效算法[J].大连理工大学学报, 1998, 38(1):97-100.
[22]  刘天云, 吕克顺, 赵国藩.钢筋混凝土框架结构的可靠性分析[J].大连理工大学学报, 1998, 38(2):223-227.
[23]  CORNELL C A.Bounds on the Reliability of Structural Systems[J].Journal of the Structural Division, 1967, 93(1):171-200.
[24]  DITLEVSEN O.Narrow Reliability Bounds for Structural System[J].Journal of Structural Mechanics, 1979, 7(4):453-472.
[25]  李云贵, 赵国藩.结构体系可靠度的近似计算方法[J].土木工程学报, 1993, 26(5):70-76.
[26]  BRUNEAU M.Evaluation of System-Reliability Methods for Cable-Stayed Bridge Design[J].Journal of Structural Engineering, 118(4):1 106-1 120.
[27]  吕颖钊, 贺拴海.缺损钢筋混凝土梁桥模糊可靠性评价模型[J].交通运输工程学报, 2005, 5(4):58-62.
[28]  贺拴海, 吕颖钊.考虑材料耐久性的在役混凝土结构可靠度研究[J].建筑科学与工程学报, 2005, 22(1):71-75.
[29]  王元清, 张 勇, 石永久, 等.吊索与钢管混凝土拱桥新型节点承载性能分析[J].建筑科学与工程学报, 2005, 22(3):55-58.
[30]  周 敉, 宋一凡, 赵小星.预应力混凝土桥梁悬臂浇筑的施工控制[J].长安大学学报:自然科学版, 2005, 25(6):43-48.
[31]  王 毅, 叶见曙, 顾祥峰.横梁预应力束的平弯对混凝土斜拉桥边箱斜腹板的影响[J].交通运输工程学报, 2005, 5(2):51-55.
[32]  贺拴海, 任 伟, 赵小星.碳纤维布对具有初应力的钢筋混凝土梁抗剪加固试验[J].长安大学学报:自然科学版, 2004, 24(1):34-39.
[33]  刘 扬, 张建仁, 李传习.混凝土斜拉桥施工期的时变可靠度计算[J].中国公路学报, 2004, 17(3):31-35.
[34]  李扬海, 鲍卫刚.公路桥梁结构可靠度与概率极限状态设计[M].北京:人民交通出版社, 1997.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133