ZHANG Feng,YE Jian-shu,XU Xiang-feng.Nonlinear Analysis Element Model of Prestressed Concrete Beam[J].Journal of Traffic and Transportation Engineering,2007,7(5):68-72.
[2]
GAO Jian,PEI Min-shan.Analysis of Space Stress in Anchoring Box Between Cable and Beam of Long-span Cable-stayed Bridge[J].Journal of Architecture and Civil Engineering,2006,23(3):66-70.
[3]
CHEN Chang-song.Study on Fine Theory of Geometric Nonlinear and Its Application for Super Long-span Cable-stayed Bridge Through Construction Stage[D].Changsha:Central South University,2007.
[4]
YIN Chao.Geometric Nonlinearity Analysis of Long-span Cable-stayed Bridge[D].Chengdu:Southwest Jiaotong University,2005.
[5]
LIAO Xiao-xiong,HUANG Yan,GUO Ben,et al.Simulation and Analysis of Construction State of Cable-stayed Bridge Based on ANSYS[J].Journal of Wuhan University of Technology:Transportation Science & Engineering,2006,30(3):496-499.
ZENG Yong-ping,ZHANG Liang-liang.The Applying of Finite Element Method for Simulation Analysis of Cable-stayed Bridge[J].Highway,2006(10):19-21.
[18]
YANG Mei-liang,LI Chuan-xi,ZHANG Jian-ren.Nonlinearity and Emulation Analysis for Construction Sequences of Cable-stayed Bridges[J].Journal of Changsha Communications University,2006,22(1):17-21.
[19]
LIU Lei,XU Dong.Steel Arch Tower Prestressed Concrete Cable-stayed Bridge-Spacial Analysis and Tension Method Reseach[C]//China Civil Engineering Society.The 18th National Bridge Academic Conference Symposium.Beijing:China Communications Press,2008.
[20]
YAN Dong-huang,LIU Guang-dong.Forward-iteration Method for Determining Rational Construction State of Cable-stayed Bridges[J].China Journal of Highway and Transport,1999,12(2):59-64.
[21]
CHEN Ling-yu,LI Xin-ran,CHEN De-wei.Erection Control for Jiangyin Wuxing Bridge(Cable-stayed Bridge)[J].Structure Engineers,2005,21(6):85-90.