JTG B01—2003,Technical Standard for Highway Engineering[S].
[2]
JTG D80—2006,General Specification of Freeway Traffic Engineering and Roadside Facilities[S].
[3]
Japan Highway Public Corporation.Japanese Ex-pressway Design Standard[M].Translated by Translation Group of Department of Construction Management, Ministry of Communications.Xi'an:Shaanxi Travel & Tourism Press,1991.
[4]
WANG Jian-wei,TANG Yi.Transportation Potential Calculation Model of Pause Rate in Expressway Ser-vice Area[J].China Journal of Highway and Transport,2008,21(5):109-114.
HUA Ben,GUO Ping-sheng,HAN Guang-ze,et al.The Study of Field Synergy Theory in Transfer Processes[C]//IMAYISHI N.Proceedings of 2001 IAMS International Seminar on Material for Use in Lithium Batteries and Transport Phenomena in Ma-terials Processing.Kasuga:Kyushu University,2001:107-115.
[15]
CUI Hong-jun,LIU Kong-jie.A New Determine Method on Pause Rate in Expressway Service Area Based on Vehicle Continuous Travel Time[J].Journal of Hebei University of Technology,2008,37(6):100-104.
[16]
SUN Xiao-nian.Investigation and Forecast of the Pause Rate of Guangdong Expressway Service Area[J].Guangdong Highway Communications,2002(1):50-52.
[17]
JI Jin-zhang,CHEN Hao.Research on Calculated Model of Service Area Scale[J].Journal of Highway and Transportation Research and Development:Applied Technology Edition,2006(10):171-173.
[18]
ZHOU Xun,LIU Su-li,WANG Chao.Discussion on Highway Service Center Parking Spot Index[J].Western China Communications Science & Technol-ogy,2010(7):80-82,89.