FREEMAN R B.A Cobweb Model of Supply and Starting Salary of New Engineers[J].Industrial and Labor Relations Review,1976,29(2):236-248.
[8]
VAN DE VOOREN F W C J.Modelling Transport in Interaction with the Economy[J].Transportation Research Part E,2004,40(5):417-437.
[9]
ZOU Zhi-jun,YANG Dong-yuan.A Comprehensive Review of Road Traffic Simulation Research [J].Journal of Traffic and Transportation Engineering,2001,1(2):88-91.
[10]
CHEN Xiao-hong,YANG Chao,LIN Hang-fei.Urban Transportation Simulation System:Design and Development[J].Urban Transport of China,2007,5(5):28-32.
[11]
JIN Man,CHEN Feng.Study of Discretionary Lane-changing in Microscopic Traffic Simulation [J].Computer Engineering and Applications,2007,43(14):199-201,226.
[12]
MENG Xiang-yan.Research on Capacity of Expressway Weaving Sections[D].Nanjing:Southeast University,2006.
[13]
WANG Jia-fan,LUO Da-yong.Lane Changing Model in Microscopic Traffic Simulation [J].Systems En-gineering,2004,22(3):92-95.
[14]
WU Zheng.A Fluid Dynamics Model for the Low Speed Traffic Systems[J].Acta Mechanica Sinica,1994,26(2):149-157.
[15]
JIANG Rui,WU Qing-song.Study on Propagation Speed of Small Disturbance from a Car-following Approach[J].Transportation Research Part B,2003,37(1):85-99.