LIN Yuan-pei.Cable-stayed Bridge[M].Beijing:China Communications Press,2004.
[3]
LEONHARDT F,ANDRAE W,ANDRAE H P,et al.New Improved Bonding Means for Composite Load Bearing Structures with High Fatigue Strength[J].Beton-und Stahlbetonbau,1987,82(12):325-331.
[4]
OGUEJIOFOR E C,HOSAIN M U.Numerical Analysis of Push-out Specimens with Perfobond Rib Connectors[J].Computers & Structures,1997,62(4):617-624.
GAO Zong-yu.Design of Composite Girder Cable-stayed Bridge over Minjiang River at Qingzhou[J].Bridge Constrution,2001(4):13-17.
[9]
DI Jin,ZHOU Xu-hong,YOU Jin-lan,et al.Mechanical Property of Cable-pylon Anchorage Zone of Cable-stayed Bridge with Steel Box Girder[J].China Journal of Highway and Transport,2007,20(4):48-52.
[10]
Chang'an University.Process Experimental Research on Cable-pylon Anchorage Structure of Fujian Xiamen-Zhangzhou Cross-sea Bridge[R].Xi'an:Chang'an University,2012.
[11]
长安大学.斜拉桥索塔新型锚固体系研究[R].西安:长安大学,2012.
[12]
Chang'an University.Research on Technology of a New Cable-pylon Anchorage System for Cable-stayed Bridge[R].Xi'an:Chang'an University,2012.