大跨度钢主梁斜拉桥的自适应无应力构形控制

, PP. 55-58

Keywords: 桥梁工程,斜拉桥,无应力构形控制,施工控制,自适应过程

Full-Text   Cite this paper   Add to My Lib

Abstract:

?为了实现对大跨度钢主梁斜拉桥高精度、高效率的施工控制,基于自适应无应力构形控制思想,推导了设计参数误差和钢主梁顶、底板焊缝收缩差对主梁安装线形的影响量调整公式,导出了主梁节段定位时温度影响的标高调整量公式,并在综合考虑此类影响因素的基础上建立了主梁节段精确定位的实时放样公式,最后将研究成果在荆岳长江公路大桥施工全过程中进行应用。结果表明:该方法能极大方便斜拉桥的施工与控制工作,提高其控制精度及效率。

References

[1]  GAO Jian,PEI Min-shan.Analysis of Space Stress in Anchoring Box Between Cable and Beam of Long-span Cable-stayed Bridge[J].Journal of Architecture and Civil Engineering,2006,23(3):66-70.
[2]  FLEMING J F.Nonlinear Static Analysis of Cable-stayed Bridge Structures[J].Computers & Structures,1979,10(4):621-635.
[3]  MANABE Y,HIRAHARA N,MUKASA N,et al.Accuracy Control on the Construction of Tatara Bridge[C]//IABSE.Cable-stayed Bridges-Past,Present and Future.Zurich:IABSE,1999:322-331.
[4]  秦顺全.桥梁施工控制——无应力状态法理论与实践[M].北京:人民交通出版社,2007.
[5]  QIN Shun-quan.Bridge Construction Control-The-ory and Practice of Unstress State Method[M].Beijing:China Communications Press,2007.
[6]  高 剑,裴岷山.大跨度斜拉桥索梁锚箱空间受力分析[J].建筑科学与工程学报,2006,23(3):66-70.
[7]  周绪红,戴 鹏,狄 谨.钢箱梁斜拉桥成桥索力优化分析[J].建筑科学与工程学报,2007,24(2):19-23.
[8]  ZHOU Xu-hong,DAI Peng,DI Jin.Optimization Analysis of Cable Tensions of Dead Load State for Cable-stayed Bridge with Steel Box Girder[J].Journal of Architecture and Civil Engineering,2007,24(2):19-23.
[9]  SAAFANA S A.Theoretical Analysis of Suspension Bridges[J].Journal of the Structural Division,1966,92(ST4):1-11.
[10]  陈常松,颜东煌,陈政清.带刚臂的两节点精确悬链线索元的非线性分析[J].工程力学,2007,24(5):29-34.
[11]  CHEN Chang-song,YAN Dong-huang,CHEN Zheng-qing.Nonlinear Analysis of Two-node Accurate Catenary Cable Element with Arbitrary Rigid Arms[J].Engineering Mechanics,2007,24(5):29-34.
[12]  陈常松,颜东煌,陈政清.超大跨度斜拉桥的自适应无应力构形控制法[J].中外公路,2008,28(1):64-67.
[13]  CHEN Chang-song,YAN Dong-huang,CHEN Zheng-qing.Construction Control of Self-adaptive Zero-stress Configure for Super Long-span Cable-stayed Bridge[J].Journal of China & Foreign Highway,2008,28(1):64-67.
[14]  李 乔,卜一之,张清华.基于几何控制的全过程自适应施工控制系统研究[J].土木工程学报,2009,42(7):69-77.
[15]  LI Qiao,BU Yi-zhi,ZHANG Qing-hua.Whole-pro-cedure Adaptive Construction Control System Based on Geometry Control Method[J].China Civil Engin-eering Journal,2009,42(7):69-77.
[16]  颜东煌,陈常松,涂光亚.混凝土斜拉桥施工控制温度影响及现场修正[J].中国公路学报,2006,19(4):71-76.
[17]  YAN Dong-huang,CHEN Chang-song,TU Guang-ya.Temperature Influence and Its Field Correction During Construction Control of Concrete Cable-stayed Bridge[J].China Journal of Highway and Transport,2006,19(4):71-76.