基于测点位移差的中、下承式拱桥吊杆损伤识别

, PP. 83-88

Keywords: 桥梁工程,中、下承式拱桥,测点位移差,损伤识别,吊杆

Full-Text   Cite this paper   Add to My Lib

Abstract:

?根据摄动有限元法原理,提出了基于测点间位移差的变化进行吊杆损伤识别的方法。进行吊杆损伤识别时,先测试吊杆节点间的高程差,并减去损伤前相同2个节点竖向位移差,得到吊杆损伤后2个节点竖向位移差的变化;再通过节点竖向位移差的变化构成吊杆损伤识别方程;当损伤识别初定方程和确定方程识别结果基本一致时,即判定吊杆发生损伤,并取2个方程所得吊杆损伤程度均值作为损伤程度;最后,以京珠高速郑州黄河二桥主桥为例验证了该方法。结果表明:采用该方法进行吊杆损伤识别,识别结果精度较高,即使对于小程度损伤也可识别,且测量误差对识别结果影响较小。

References

[1]  GHORBANPOOR A.Acoustic Emission Characterization of Fatigue Crack Growth in Highways Bridges Components[D].College Park:University of Maryland,1985.
[2]  徐 宏.桥梁拉(吊)索损伤后力学分析及安全评价[D].西安:长安大学,2008.
[3]  XU Hong.Mechanical Analysis and Safety Evaluation of Bridge Damaged Cable[D].Xi'an:Chang'an University,2008.
[4]  WANG Su-juan.Design and Damage Static & Dynamic Analysis of a Concrete-filled Steel Tube Arch Bridge Model[D].Shantou:Shantou University,2007.
[5]  徐建伟,李飞泉,彭 卫.中承式拱桥的吊杆损伤识别[J].公路,2007(12):71-77.
[6]  XU Jian-wei,LI Fei-quan,PENG Wei.Damage Identification for Half Through Arch Bridge Suspender[J].Highway,2007(12):71-77.
[7]  李冬生.拱桥吊杆损伤监测与健康诊断[D].哈尔滨:哈尔滨工业大学,2007.
[8]  LI Dong-sheng.Damage Monitoring and Health Diagnosis for Arch Bridge Suspender[D].Harbin:Harbin Institute of Technology,2007.
[9]  CHEN Huai,DONG Jian-hua.Practical Formulae of Vibration Method for Suspender Tension Measure on Half-through and Through Arch Bridge[J].China Journal of Highway and Transport,2007,20(3):66-70.
[10]  殷学纲,姚建军.中承式拱桥吊索损伤对吊索系静张力的影响[J].中国公路学报,2004,17(1):45-48.
[11]  YIN Xue-gang,YAO Jian-jun.Effect on Sling System Tension from Sling Damage in Mid-supported Arch Bridge[J].China Journal of Highway and Transport,2004,17(1):45-48.
[12]  BUNDY S A H.Eddy Current Testing of Wire and Bar[J].Wire Industry,1981,48(576):887-888.
[13]  王素娟.钢管混凝土拱桥模型的设计和损伤静动力分析[D].汕头:汕头大学,2007.
[14]  陈 淮,董建华.中、下承式拱桥吊索张力测定的振动法实用公式[J].中国公路学报,2007,20(3):66-70.
[15]  何 伟.中、下承式钢管混凝土拱桥损伤识别关键问题研究[D].郑州:郑州大学,2010.
[16]  HE Wei.Research on the Key Problem of Damage Identification Method for Half Through or Through Concrete Filled Steel Tubular Arch Bridge[D].Zhengzhou:Zhengzhou University,2010.

Full-Text

Contact Us

service@oalib.com

QQ:3279437679

WhatsApp +8615387084133