TAO Jian-shan.Construction Technology for Draining-sinkage for South Caisson Anchorage to Taizhou Yangtze River Highway Bridge with Large-sized Sunk Well[J].Journal of Railway Engineering Society,2009(1):63-66.
[4]
葛春辉.钢筋混凝土沉井结构设计施工手册[M].北京:中国建筑工业出版社,2004.
[5]
GE Chun-hui.Structural Design of Reinforced Concrete Caisson Construction Manual[M].Beijing:China Architecture & Building Press,2004.
[6]
JTG D63—2007,公路桥涵地基与基础设计规范[S].JTG D63—2007,Code for Design of Ground Base and Foundation of Highway Bridges and Culverts[S].
[7]
CECS 137:2002,给水排水工程钢筋混凝土沉井结构设计规程[S].
[8]
CECS 137:2002,Specification for Structural Design of Reinforced Concrete Sinking Well of Water Supply and Sewerage Engineering[S].
[9]
XU Tao,LI Yang,WU Min-wu,et al.Resistance Monitoring in Construction of Caisson Foundation of Cofferdam of Xiangjiaba Hydropower Station[J]. Journal of Yangtze River Scientific Research Institute,2009,26(8):92-94.
CHEN Xiao-ping,QIAN Ping-yi,ZHANG Zhi-yong.Study on Penetration Resistance Distribution Characteristic of Sunk Shaft Foundation[J].Chinese Journal of Geotechnical Engineering,2005,27(2):148-152.
YAN Deng-feng,HAN Xiao-lei.Study on the Open Caisson Wall Earth Pressure in the Loess Region[J].Journal of Changchun Institute of Technology:Natural Science Edition,2008,9(3):8-10,11.
[14]
GIMSING N J.大贝尔特海峡:东桥[M].西南交通大学土木工程学院桥梁工程系,中铁大桥局武汉桥梁科学研究院,译.成都:西南交通大学出版社,2008.
[15]
GIMSING N J.Belt Strait:East Bridge[M].Translated by Department of Bridge Engineering,School of Civil Engineering,Southwest Jiaotong University,Wuhan Bridge Science Research Institute of China Railway Bridge Bureau.Chengdu:Southwest Jiaotong University Press,2008.
[16]
金增洪.明石海峡大桥简介[J].国外公路,2001,21(1):13-18.
[17]
JIN Zeng-hong.Akashi Strait Bridge Introduction[J].Journal Foreign Highway,2001,21(1):13-18.
[18]
HOWARD R J,DOVER A,STEVENS R,et al.Pile Installation Demonstration Project for the New East Span of the San Francisco-Oakland Bay Bridge[C]//O'NEILL M W,TOWNSEND F C.International Deep Foundations Congress 2002:An International Perspective on Theory,Design,Construction,and Performance.Reston:ASCE,2002:158-172.
[19]
安 琳,丁大钧.香港青马大桥简介[J].桥梁建设,1997(3):22-26.
[20]
AN Lin,DING Da-jun,Introduction of Tsing Ma Bridge in Hong Kong[J].Bridge Construction,1997(3):22-26.
[21]
ALLENBY D, WALEY G,KILBURN D.Examples of Open Caisson Sinking in Scotland[J].Proceedings of the Institution of Civil Engineering-Geotechnical Engineering,2009,162(1):59-70.
[22]
ZHU Jian-min,GONG Wei-ming,MU Bao-gang,et al.Bottleneck Problem Study on First Stage Sinking of Super-large Caisson[J].Highway,2011(4):13-18.
[23]
段良策,殷 奇.沉井设计与施工[M].上海:同济大学出版社,2006.
[24]
DUAN Liang-ce,YIN Qi.Design and Construction of Caisson[M].Shanghai:Tongji University Press,2006.
[25]
刘建航,侯学渊.基坑工程手册[M].北京:中国建筑工业出版社,1997.
[26]
LIU Jian-hang,HOU Xue-yuan.Excavation Engineering Handbook[M].Beijing:China Architecture & Building Press,1997.
MEI Guo-xiong,ZAI Jin-min.Rankine Earth Pressure Model Considering Deformation[J].Chinese Journal of Rock Mechanics and Engineering,2001,20(6):851-853.
MU Bao-gang,ZHU Jian-min,NIU Ya-zhou.Monitoring and Analysis of North Anchorage Caisson of Fourth Nanjing Yangtze River Bridge[J].Chinese Journal of Geotechnical Engineering,2011,33(2):269-274.