ZHANG Pei-xin.Design for Steel-concrete Composite Structure[M].Shanghai:Shanghai Science Press,2004.
[3]
ZHAN Yu-lin,ZHAO Ren-da,MAO Xue-ming.Comparison of the Loading Capacity of Shear Connectors in Steel-concrete Composite Structures[J].Building Science Research of Sichuan,2006,32(6):16-19.
[4]
LIU Yong-jian,ZHANG Ning,ZHANG Jun-guang.Mechanical Behavior of Concrete-filled Square Steel Tube Stiffened with PBL[J].Journal of Architecture and Civil Engineering,2012,29(4):13-17.
LI Xian-hui,LI Guo-qiang.Pull out Experiment on Shear Connector in Embedded Composite Beams with Notched Web[J].Journal of Architecture and Civil Engineering,2009,26(1):43-48.
[7]
VALENTE I,CRUI P J S.Experimental Analysis of Perfobond Shear Connection Between Steel and Lightweight Concrete[J].Journal of Constructional Steel Research,2004,60(3):465-479.
[8]
刘玉擎,周伟翔,蒋劲松.开孔板连接件抗剪性能试验研究[J].桥梁建设,2006(6):1-4.
[9]
HU Jian-hua,YE Mei-xin,HUANG Qiong.Experiment on Bearing Capacity of PBL Shear Connectors[J].China Journal of Highway and Transport,2006,19(6):65-72.
[10]
OGUEJIOFOR E C,HOSAIN M U.Numerical Analysis of Push-out Specimens with Perfobond Rib Connectors[J].Computers & Structures,1997,62(4):617-624.
[11]
刘玉擎.组合结构桥梁[M].北京:人民交通出版社,2005.
[12]
LIU Yu-qing.Steel-concrete Hybrid Bridge[M].Beijing:China Communications Press,2005.
WANG Chun-sheng,WANG Ding,WANG Qian,et al.Finite Element Analysis of Connection for Steel Pylon and Concrete Foundation[J].Journal of Architecture and Civil Engineering,2010,27(2):87-95.
XIE Su-chao,TIAN Hong-qi,YAO Song.Finite Element Analysis of Composite Structure of Eccentric Beam and Plate[J].Journal of Traffic and Transportation Engineering,2006,6(4):5-9.
[19]
LIU Yu-qing,ZHOU Wei-xiang,JIANG Jin-song.Experimental Study of Shearing Behavior of Perforated Plate Connector[J].Bridge Construction,2006(6):1-4.
AHNA J H,LEE C G,WONA J H,et al.Shear Resistance of the Perfobond-rib Shear Connector Depending on Concrete Strength and Rib Arrangement[J].Journal of Constructional Steel Research,2010,66 (10):1295-1307.