JIANG Hua-qin,ZHUANG Qian-wei.Experimental Research on Simulated Tunneling of Rectangular Shield Machine[J].Road Machinery & Construction Mechanization,2011,28(3):68-70.
WANG Jin-chang,LIU Guan-shui,SUN Lian-wei.Study on Numerical Simulation of Soil Reinforcement of Shield Arriving End[J].Road Machinery & Construction Mechanization,2012,29(4):34-38.
GONG Xiu-bing,XU Yong-jie,HAN Jing-yu.Selection and Calculation of the Earth Pressure for Shield Tunneling[J].Road Machinery & Construction Mechanization,2007,24(11):46-48.
[7]
丁 凯.盾构机的技术特点分析[J].筑路机械与施工机械化,2006,23(5):8-10.
[8]
DING Kai.Technical Characteristics of Tunnel Shield[J].Road Machinery & Construction Mechanization,2006,23(5):8-10.
HAN Ri-mei,SONG Zhan-ping,XIE Yong-li,et al.Affection of Soil Warehouses Pressure of EPB Shield on Ground Settlement[J].Journal of Chang'an University:Natural Science Edition,2010,30(1):59-62,99.
ZHOU Hong-gao,ZHENG Yi-feng,CHEN Hao.Characteristics of Soil Surface Settlement for Double-O-Tube Shield Tunnel[J].Journal of Architecture and Civil Engineering,2006,23(2):62-67.
SUN Jun.Durability Design of Segment Lining Structure in Chongming Yangtze River Shield Tunnel[J].Journal of Architecture and Civil Engineering,2008,25(1):1-9.
HE Chuan,FENG Kun.Review and Prospect of Structure Research of Underwater Shield Tunnel with Large Cross-section[J].Journal of Southwest Jiaotong University,2011,46(1):1-11.
[19]
KOYAMA Y.Present Status and Technology of Shield Tunneling Method in Japan[J].Tunnelling and Underground Space Technology,2003,18(2/3):145-159.
[20]
UCHIDA K.Design and Engineering of Large Bore Slurry Shield Tunnel Lining System for Trans-Tokyo Bay Highway[J].Civil Engineering in Japan,1992,30:54-67.
[21]
TAKIMOTO T,HAYASHI M,SAITOH M.Loading Test of Shield Tunnel Living(No.1)[J].Proceedings of Annual Conference of the Japan Society of Civil Engineers,1994,49:1330-1331.
[22]
HAYASHI M,SAITO M,KOIZUMI A.Experimental Studies and Numerical Analyses on the Properties of a New Type Segment for Gas Pipeline Shield Tunnel[J].Journal of Geotechnical Engineering,1996(535):43-56.
[23]
KASHIMA Y,KONDO N,INOUE M.Development and Application of the DPLEX Shield Method:Results of Experiments Using Shield and Segment Models and Application of the Method in Tunnel Construction[J].Tunnelling and Underground Space Technology,1996,11(1):45-50.
WANG Ru-lu,SONG Bo,WANG Qi,et al.Lining Experiment and Structure Analysis of Bi-circular Shield Tunnel with Staggered Joint Splice on Segments[J].Underground Engineering and Tunnels,2001(1):12-15.
[26]
NAKAMURA H,KUBOTA T,FURUKAWA M,et al.Unified Construction of Running Track Tunnel and Crossover Tunnel for Subway by Rectangular Shape Double Track Cross-section Shield Machine[J].Tunneling and Underground Space Technology,2003,18(2/3):253-262.
WANG Biao,LIU Zu-hua,LU Liang.A Loading Method of the Test for Lining Whole Wreath of Shanghai Chongming Tunnel[J].Construction Technology,2006,35(S):52-54.
FENG Kun,HE Chuan,SU Zong-xian.Prototype Test on Failure Characteristics of Segmental Lining Structure for Nanjing Yangtze River Tunnel[J].Journal of Southwest Jiaotong University,2011,46(4):564-571.
HE Chuan,FENG Kun,SU Zong-xian.Development and Application of Loading Test System of Prototype Structure for Underwater Shield Tunnel with Large Cross-section[J].Chinese Journal of Rock Mechanics and Engineering,2011,30(2):254-266.