TREJO D,PILLAI R G,HUESTE M B D,et al.Parameters Influencing Corrosion and Tension Capacity of Post-tensioning Strands[J].ACI Materials Journal,2009,106(2):144-153.
[2]
刘其伟,张鹏飞,吴建平.实桥预应力孔道压浆调查和钢丝性能分析[J].桥梁建设,2006(5):72-75.LIU Qi-wei,ZHANG Peng-fei,WU Jian-ping.Investigation of Duct Grouting and Analysis of Steel Wire Behavior of an Actual Post-tensioned Concrete Bridge[J].Bridge Construction,2006(5):72-75.
[3]
朱坤宁,叶见曙.后张法箱梁孔道压浆密实程度调查[J].现代交通技术,2007,4(1):39-42.ZHU Kun-ning,YE Jian-shu.Investigation of Duct Grouting Compactness of Post-prestressed Box Girder[J].Modern Transportation Technology,2007,4(1):39-42.
[4]
吴文清,陈小刚,李 波,等.预应力混凝土连续箱梁施工质量评价指标调查[J].建筑科学与工程学报,2009,26(3):42-48.WU Wen-qing,CHEN Xiao-gang,LI Bo,et al.Investigation of Construction Quality Evaluating Indices in PC Continuous Box-girder [J].Journal of Architecture and Civil Engineering,2009,26(3):42-48.
[5]
EL ZGHAYAR E,MACKIE K R,HABER Z B,et al.Secondary Anchorage in Post-tensioned Bridge Systems[J].ACI Structural Journal,2013,110(4):629-638.
[6]
WOOD S L,MCKINSTRY C A,LEE J K.Residual Tensile Capacity of Grouted Post-tensioned Tendons[J].ACI Structural Journal,2013,110(6):1099-1108.
[7]
LI F M,YUAN Y S.Effects of Corrosion on Bond Behavior Between Steel Strand and Concrete[J].Construction and Building Materials,2013,38:413-422.
[8]
WOUTERS J P,KESNER K,POSTON R W.Tendon Corrosion in Precast Segmental Bridges[J].Transportation Research Record,1999,1654:128-132.
[9]
OHTSU M,ALVER N.Development of Non-contact SIBIE Procedure for Identifying Ungrouted Tendon Duct[J].NDT & E International,2009,42(2):120-127.
[10]
FRICKER S,VOGEL T.Site Installation and Testing of a Continuous Acoustic Monitoring[J].Construction and Building Materials,2007,21(3):501-510.
[11]
YAMADA M,OHTSU M.Case Studies on Ungrouted Tendon-duct in Prestressed Concrete Models by SIBIE[J].Construction and Building Materials,2010,24(12):2376-2380.
[12]
SCHOEFS F,ABRAHAM O,POPOVICS J S.Quantitative Evaluation of Contactless Impact Echo for Non-destructive Assessment of Void Detection Within Tendon Ducts[J].Construction and Building Materials,2012,37:885-892.
[13]
周先雁,王智丰,晏班夫.预应力管道压浆质量无损检测方法[J].中国公路学报,2011,24(6):64-71.ZHOU Xian-yan,WANG Zhi-feng,YAN Ban-fu.Nondestructive Testing Method of Grouting Quality for Prestressed Pipe[J].China Journal of Highway and Transport,2011,24(6):64-71.
[14]
朱尔玉,王冰伟,周勇政,等.预应力孔道灌浆密实性及防治泌水方法的试验研究[J].水利学报,2012,43(5):609-614.ZHU Er-yu,WANG Bing-wei,ZHOU Yong-zheng,et al.Experimental Study on Grouting Compactness of Prestressed Duct and Technology to Deal with the Grout Bleeding[J].Journal of Hydralic Engineering,2012,43(5):609-614.
[15]
PILLAI R G,GARDONI P,TREJO D,et al.Probabilistic Models for the Tensile Strength of Corroding Strands in Posttensioned Segmental Concrete Bridges[J].Journal of Materials in Civil Engineering,2010,22(10):967-977.
[16]
GARDONI P,PILLAI R G,HUESTE M B D,et al.Probabilistic Capacity Models for Corroding Posttensioning Strands Calibrated Using Laboratory Results[J].Journal of Engineering Mechanics,2009,135(9):906-916.
[17]
PILLAI R G,HUESTE M D,GARDONI P,et al.Time-variant Service Reliability of Post-tensioned,Segmental,Concrete Bridges Exposed to Corrosive Environments[J].Engineering Structures,2010,32(9):2596-2605.
[18]
MINH H,MUTSUYOSHI H,NIITANI K.Influence of Grouting Condition on Crack and Load-carrying Capacity of Post-tensioned Concrete Beam Due to Chloride-induced Corrosion[J].Construction and Building Materials,2007,21(7):1568-1575.
[19]
MINH H,MUTSUYOSHI H,TANIGUCHI H,et al.Chloride-induced Corrosion in Insufficiently Grouted Posttensioned Concrete Beams[J].Journal of Materials in Civil Engineering,2008,20(1):85-91.