王戒躁.芜湖长江大桥整体模型(施工阶段)试验研究[J].桥梁建设,1999(4):26-31. WANG Jie-zao.Test Study of Integral Model of Wuhu Changjiang River Bridge at Construction Stage[J].Bridge Construction,1999(4):26-31.
[4]
胡建华,沈锐利,张贵明,等.佛山平胜大桥全桥模型试验研究[J].土木工程学报,2007,40(5):17-25. HU Jian-hua,SHEN Rui-li,ZHANG Gui-ming,et al.A Total Bridge Model Study of the Pingsheng Bridge in Foshan[J].China Civil Engineering Journal,2007,40(5):17-25.
[5]
刘永健,刘剑,刘君平,等.刚性悬索加劲钢桁梁桥施工阶段全桥模型试验研究[J].土木工程学报,2010,43(2):72-78. LIU Yong-jian,LIU Jian,LIU Jun-ping,et al.Integral Model Test of Steel Truss Bridge Stiffened with Rigid Cables in Construction Stage[J].China Civil Engineering Journal,2010,43(2):72-78.
[6]
胡志坚,孔祥韶,吴卫国.九堡大桥顶推施工模型试验研究[J].公路交通科技,2012,29(2):79-83. HU Zhi-jian,KONG Xiang-shao,WU Wei-guo.Model Test of Construction Jiubao Bridge with Incremental Launching[J].Journal of Highway and Transportation Research and Development,2012,29(2):79-83.
[7]
陈常松,颜东煌,田仲初,等.岳阳洞庭湖大桥模型动力相似理论分析[J].桥梁建设,2002(1):48-51. CHEN Chang-song,YAN Dong-huang,TIAN Zhong-chu,et al.Dynamical Similarity Theory Analysis to the Model of Yueyang Dongting Lake Bridge[J].Bridge Construction,2002(1):48-51.
[8]
刘爱荣,张俊平,赵新生,等.中山一桥模型试验及理论分析[J].中国公路学报,2005,18(3):75-79. LIU Ai-rong,ZHANG Jun-ping,ZHAO Xin-sheng,et al.Model Test of the First Zhongshan Bridge and Theoretical Analysis[J].China Journal of Highway and Transport,2005,18(3):75-79.
[9]
苏庆田,曾明根,吴冲.上海长江大桥索塔钢锚箱模型试验研究[J].工程力学,2008,25(10):126-132. SU Qing-tian,ZENG Ming-gen,WU Chong.Experiment Study on Steel-anchor-box of Cable-pylon in Shanghai Yangtze River Bridge[J].Engineering Mechanics,2008,25(10):126-132.
[10]
钟继卫,黄展军,王波,等.扭背索斜拉桥非对称索塔锚固区足尺模型试验研究[J].世界桥梁,2010(4):45-48. ZHONG Ji-wei,HUANG Zhan-jun,WANG Bo,et al.Study of Full-scale Model Test for Asymmetric Anchor Zone in Pylon of Cable-stayed Bridge with Twist Plane Back Stays[J].World Bridges,2010(4):45-48.
[11]
CHACON R,URIBE N,OLLER S.Numerical Validation of the Incremental Launching Method of a Steel Bridge Through a Small-scale Experimental Study[J].Experimental Techniques,2013,37:1-14.
[12]
JANKE L,CZADERSKI C,RUTH J,et al.Experiments on the Residual Load-bearing Capacity of Prestressed Confined Concrete Columns[J].Engineering Structures,2009,31(10):2247-2256.
[13]
王发祥,杨平,吴卫国,等.钢引桥结构模型分析及计算论证[J].武汉交通科技大学学报,1995,19(4):398-403. WANG Fa-xiang,YANG Ping,WU Wei-guo,et al.Structural Model Analysis and Verification for a Steel Bridge Approach[J].Journal of Wuhan Transportation University,1995,19(4):398-403.
[14]
刘涛,李爱群,丁幼亮,等.悬索桥主塔结构的有限元模拟方法研究:模型修正与验证[J].特种结构,2006,23(2):70-73. LIU Tao,LI Ai-qun,DING You-liang,et al.Finite Element Simulation Method Study for Pylons of Suspension Bridges:Modification and Verification for Finite Element Models[J].Special Structures,2006,23(2):70-73.