JTG D60—2004,公路桥涵设计通用规范[S]. JTG D60—2004,General Code for Design of Highway Bridges and Culverts[S] .
[3]
张文学,李增银,王秀平.平转速度和环境风速对临时固接结构受力影响分析[J].公路,2013(3):110-112. ZHANG Wen-xue,LI Zeng-yin,WANG Xiu-ping.Pan Speed and Environmental Impact of Wind Forces on Temporary Fixed Connected Structure[J].Highway,2013(3):110-112.
[4]
田仲初,陈耀章,赵利平,等.连续钢梁顶推过程局部接触分析及改善措施[J].长安大学学报:自然科学版,2012,32(7):44-49. TIAN Zhong-chu,CHEN Yao-zhang,ZHAO Li-ping,et al.Local Contact Analysis and Improvement Measures of Continuous Steel Girder Incremental Launching[J].Journal of Chang'an University:Natural Science Edition,2012,32(7):44-49.
[5]
孙传喜,张军,王春艳.轮轨热接触耦合效应的有限元分析[J].交通运输工程学报,2011,11(2):29-34. SUN Chuan-xi,ZHANG Jun,WANG Chun-yan.Finite Element Analysis of Wheel/Rail Thermo-contact Coupling Effect[J].Journal of Traffic and Transportation Engineering,2011,11(2):29-34.
[6]
赵勇为.转体施工中连续刚构梁桥力学特性分析[D].兰州:兰州交通大学,2013. ZHAO Yong-wei.The Mechanical Analysis of Rotary Construction on Continuous Rigid Frame Bridge[D].Lanzhou: Lanzhou Jiaotong University,2013.
[7]
刘扬,邬晓光,徐芳元.钢管造型拱竖向转体施工结构仿真分析[J].长安大学学报:自然科学版,2007,27(2):49-52. LIU Yang,WU Xiao-guang,XU Fang-yuan.Simulation of Vertical Shift Construction of Steel Tub Arch Bridge[J].Journal of Chang'an University:Natural Science Edition,2007,27(2):49-52.
[8]
王坤,韩庆华.平转施工球铰节点的受力性能研究[J].低温建筑技术,2011(11):26-28. WANG Kun,HAN Qing-hua.Study on Mechanical Behavior of Ball Joint Node for Pan Swivel Construction[J].Low Temperature Architecture Technology,2011(11):26-28.
[9]
成亚鹏,郭瑞,韩进城,等.大型履带行走装置支撑球铰接触应力分析[J].工程机械,2011,42(3):15-18. CHENG Ya-peng,GUO Rui,HAN Jin-cheng,et al.Analysis for Contact Stress of Support Ball Joint in Large Size Crawler Travel Mechanisms[J].Construction Machinery and Equipment,2011,42(3):15-18.
[10]
鲁建生,杨永宏,刘继龙.保阜高速公路跨京广铁路转体桥称重试验研究[J].铁道建筑技术,2009(5):106-109. LU Jian-sheng,YANG Yong-hong,LIU Ji-long.The Weighing Experimental Study of Swivel Bridge Crossing Beijing-Guangzhou Railway in Baoding-Fuping Expressway[J].Railway Construction Technology,2009(5):106-109.
[11]
杨武,姚文娟,刘小渝.重庆万盛藻渡大桥竖转施工转动铰受力性能分析[J].土木工程与管理学报,2012,29(1):52-55. YANG Wu,YAO Wen-juan,LIU Xiao-yu.Mechanical Property Analysis of Rotating Hinge in Chongqing Wansheng Zaodu Bridge with Vertical Lifting Rotation Construction[J].Journal of Civil Engineering and Management,2012,29(1):52-55.
[12]
翟鹏程.转体梁施工中的不平衡问题及风致振动研究[D].北京:北京交通大学,2008. ZHAI Peng-cheng.The Imbalance and Wind-induced Vibration of the Rotating Beam in Cantilever State Under Construction[D].Beijing:Beijing Jiaotong Uni-versity,2008.
[13]
王景全,张琪峰,钱桂枫,等.沪杭高铁1.68万吨转体拱桥承台设计分析方法[J].桥梁建设,2013,43(5):99-105. WANG Jing-quan,ZHANG Qi-feng,QIAN Gui-feng,et al.Design and Analysis Method for Pile of a 16 800 t Rotationally Erected Arch Bridge on Shanghai-Hang-zhou High Speed Railway[J].Bridge Construction,2013,43(5):99-105.
[14]
童激扬,郑舟军.武汉市姑嫂树路高架桥转体平台墩仿真计算[J].桥梁建设,2013,43(2):64-69. TONG Ji-yang,ZHENG Zhou-jun.Simulation Calculation of Rotation Platform Piers of Gusaoshu Road Viaduct in Wuhan City[J].Bridge Construction,2013,43(2):64-69.
[15]
波波夫瓦伦丁L.接触力学与摩擦学的原理及其应用[M].李强,雒建斌,译.北京:清华大学出版社,2011. POPOV V L.Contact Mechanics and Friction Physical Principles and Applications[M].Translated by LI Qiang,LUO Jian-bin.Beijing:Tsinghua University Press,2011.
[16]
钱桂枫,程飞,王景全,等.沪杭高铁超大吨位转体施工拱桥建造技术[M].北京:中国铁道出版社,2012. QIAN Gui-feng,CHENG Fei,WANG Jing-quan,et al.Shanghai-Hangzhou High-speed Railway Construction of Large Tonnage Swivel Bridge Construction Technology[M].Beijing:China Railway Publishing House,2012.