YAN Dong-huang, LI Xue-wen, LIU Guang-dong, et al.Step-by-Step Arithmetic for the Reasonable Finished Dead State of the Concrete Cable-Stayed Bridges[J].China Journal of Highway and Transport, 2003, 16(1):43-46.
[2]
XIAO Ru-cheng, XIANG Hai-fan.Optimization Method of Cable Prestresses of Cable-Stayed Bridges and Its Engineering Applications[J].Chinese Journal of Computational Mechanics, 1998, 15(1):118-126.
[3]
SHI Du-zheng, WANG Jin-feng, XIANG Yi-qiang, et al.Optimum Tensioning in Construction State of Cable-Stayed Bridge[J].China Journal of Highway and Transport, 2002, 15(2):57-60.
[4]
ZHANG Xu-she, DU Yan-liang, JIN Xiu-mei, et al.In-Suit Monitoring for Cables Tension with Optical Fiber Grating Sensors[J].Journal of Traffic and Transportation Engineering, 2003, 3(4):22-24.
[5]
ZHANG Jian-min, ZHENG Jie-lian, QIN Rong.Time-Dependent Behavior Analysis of Long Span CFST Arch Bridge[J].Journal of Chongqing Jiaotong University, 2001, 20(4):11-15.
[6]
HAO Chao.Construction Control and Control Precision Goal of Long-Span Steel Cable-Stayed Bridge[J].China Journal of Highway and Transport, 2003, 16(1):54-57.
[7]
DI Jin, HUANG Qing.Simulation of Construction Control for One Inclined Tower Cable-Stayed Bridge of Steel-Concrete Composite Box Girder Without Back Stay[J].Journal of Changan University:Natural Science Edition, 2004, 24(3):43-47.
[8]
WANG Jin-feng, SHI Du-zheng, XU Xing.Exploration of the Optimal Cable Tension of Cable-Stayed Bridge Under Permanent Loads[J].Journal of Zhejiang University:Engineering Science, 2002, 36(2):152-155.