MOOSAVI M, JAFARI A, KHOSRAVI A.Bond of Cement Grouted Reinforcing Bars Under Constant Radial Pressure[J].Cement & Concrete Composites, 2005, 27(1):103-109.
[2]
YANG Song-lin, XU Wei-ya, LIU Zu-de.Experimental Data Interpretation and Probability Analysis of Pulled Rock Bolts[J].Chinese Journal of Rock Mechanics and Engineering, 2003, 22(1):61-64.
[3]
JGJ 70—90, 建筑砂浆基本性能试验方法[S].
[4]
JTG E30—2005, 公路工程水泥及水泥混凝土试验规程[S].
[5]
SL 264—2001, 水利水电工程岩石试验规程[S].
[6]
KILIC A, YASAR E, CELIK A G.Effect of Grout Properties on the Pull-out Load Capacity of Fully Grouted Rock Bolt[J].Tunnelling and Underground Space Technology, 2002, 17(4):355-362.
[7]
YI Ke-liang, XU Hua-bin, LOU Yan-chun.Discussion on Anchorage Depth of Full-length Bonding Rock Bolt[J].Nonferrous Metals Design, 2004, 31(3):37-44.
[8]
GB 50330—2002, Technical Code for Building Slope Engineering[S].
[9]
JTG D30—2004, Specifications for Design of Highway Subgrades[S].
[10]
JIANG Zhong-xin.A Gauss Curve Model on Shear Stress Along Anchoring Section of Anchoring Rope of Extensional Force Type[J].Chinese Journal of Geotechnical Engineering, 2001, 23(6):696-699.
[11]
XU Jing-mao, GU Lei-yu.Testing Study on the Peak Shear Strength Between Grout and Bore Wall in the Interior Bond Section of Prestressed Anchorage Cable[J].Chinese Journal of Rock Mechanics and Engin-eering, 2004, 23(22):3765-3769.
HORVATH R G, KENNY T C, KOZICKI P.Method of Improving the Performance of Drilled Piers in Weak Rock[J].Canadian Geotechnical Journal, 1983, 20(4):758-772.
[14]
JGJ 70—90, Standard for Test Method of Basic Properties of Construction Mortar[S].
[15]
JTG E30—2005, Test Methods of Cement and Concrete for Highway Engineering[S].
[16]
SL 264—2001, Specifications for Rock Tests in Water Conservancy and Hydroelectric Engineering[S].