WANG Hui, LI Da-yong, XIA Guang-hong.Analysis of Problems Arising from and Measures Taken in the Construction of Grouting at Tail of the Shield Machine[J].Journal of University of Science and Technology of Suzhou:Engineering and Technology, 2004, 17(1):40-45.
[2]
SHEN Zheng-nan.Analysis and Control of the Upward Moving of Tunnel Segments in the Process of Shield Excavation[J].Modern Tunnelling Technology, 2004, 41(6):51-56.
JIANG Hong-sheng, HOU Xue-yuan.Theoretical Study of Rotating Stiffness of Joint in Shield Tunnel Segments[J].Chinese Journal of Rock Mechanics and Engineering, 2004, 23(9):1574-1577.
[5]
HUANG Zhong-hui.Research on Stagger-joined Segmental Linings Behavior of Shield-tunnel[D].Shanghai:Tongji University, 2001.
[6]
LEE K M, HOU X Y, GE X W, et al.An Analytical Solution for a Jointed Shield-driven Tunnel Lining[J].International Journal for Numerical and Analytical Methods in Geotechnics, 2001, 25(4):365-390.
[7]
LIU Jian-hang, HOU Xue-yuan.Shield-driven Tunnels[M].Beijing:China Railway Publishing House, 1991:315-316.
BLOM C B, HORST E J, JOVANOVIC P S.Three-dimensional Structural Analyses of the Shield-driven “Green Heart” Tunnel of the High-speed Line South[J].Tunneling and Underground Space Technology, 1999, 14(2):217-224.
[11]
LING Xian-zhang, WANG Li-xia, WU Li-xin.Numerical Analysis of the Varying Law of Tunnel Surrounding Soil Displacement Produced by Shield Tunnel[J].China Journal of Highway and Transport, 2003, 16(2):78-81.
LEE K M, GE X W.The Equivalence of a Jointed Shield-driven Tunnel Lining to a Continuous Ring Structure[J].Canadian Geotechnical Journal, 2001, 38(3):461-483.
[15]
刘建航, 侯学渊.盾构法隧道[M].北京:中国铁道出版社, 1991:315-316.
[16]
DONDE P M, WANG J J.Shear Transfer Through Bolts in Segmental Tunnel Linings[C]//VIEITEZ-UTESA L, MONTANEZ-CARTAXO L E.Towards New Worlds in Tunnelling.Rotterdam:BALKEMA A A, 1992:295-301.