MICHALOPOULOS P G,STEPHANOPOULOS G.Oversaturated Signal Systems with Queue Length Constraints-Ⅰ:Single Intersection[J].Transportation Research,1977,11(6):413-421.
[2]
CHANG T H,LIN J T.Optimal Signal Timing for an Oversaturated Intersection[J].Transportation Research Part B,2000,34(6):471-491.
[3]
LO H K,CHANG E,CHAN Y C.Dynamic Network Traffic Control[J].Transportation Research Part A,2001,35(8):721-744.
[4]
LI M T,GAN A.Signal Timing Optimization for Oversaturated Networks Using TRANSYT-7F[J].Transportation Research Record,1999(1683):118-126.
[5]
DAGANZO C F.Urban Gridlock:Macroscopic Modeling and Mitigation Approaches[J].Transportation Research Part B,2007,41(1):49-62.
[6]
ARDEKANI S,HERMAN R.Urban Network-wide Traffic Variables and Their Relations[J].Transportation Science,1987,21(1):1-16.
[7]
GIRIANNA M,BENEKOHAL R F.Dynamic Signal Coordination for Networks with Oversaturated Intersections[J].Transportation Research Record,2002(1811):122-130.
[8]
VIGOS G,PAPAGEORGIOU M,WANG Y B.Real-time Estimation of Vehicle-count Within Signalized Links[J].Transportation Research Part C,2008,16(1):18-35.
[9]
PAPAGEORGIOU M.Applications of Automatic Control Concepts to Traffic Flow Modeling and Control[J].Berlin:Springer-Verlag,1983.
[10]
周凤歧,强文鑫,阙志宏.现代控制理论引论[M].北京:国防工业出版社,1988.
[11]
GAZIS D C.Optimum Control of a System of Oversaturated Intersections[J].Operations Research,1964,12:815-831.
[12]
MICHALOPOULOS P G,STEPHANOPOULOS G.Oversaturated Signal Systems with Queue Length Constraints-Ⅱ:Systems of Intersections[J].Transportation Research,1977,11(6):423-428.
[13]
CHANG T H,SUN G T.Modeling and Optimization of an Oversaturated Signalized Network[J].Transportation Research Part B,2004,38(8):687-707.
[14]
BYUNGKYU P.Enhanced Genetic Algorithm for Signal-timing Optimization of Oversaturated Intersections[J].Transportation Research Record,2000(1727):32-41.
[15]
YUAN Chang-liang,YANG Xiao-guang,SHEN Feng.Fixed Cycle Strategy in Oversaturated Network Traffic Control[C]//IEEE.Proceedings of the 6th World Congress on Intelligent Control and Automation.Dalian:IEEE,2006:8674-8678.
[16]
HERMAN R,PRIGOGINE I.A Two-fluid Approach to Town Traffic[J].Science,1979,204(4389):148-151.
[17]
GEROLIMINIS N,DAGANZO C F.Existence of Urban-scale Macroscopic Fundamental Diagrams:Some Experimental Findings[J].Transportation Research Part B,2008,42(9):759-770.
[18]
GEROLIMINIS N,DAGANZO C F.Macroscopic Modeling of Traffic in Cities[C]//TRB.86th Annual Meeting of Transportation Research Board.Washington DC:TRB,2007:413.
[19]
WALLACE C E,COURAGE K G,CHANG E C P.Methodology for Optimizing Signal Timing[R].Gainesville:FHWA,1991.
[20]
ZHOU Feng-qi,QIANG Wen-xin,QUE Zhi-hong.Introduction of Modern Control Theory[M].Beijing:Defense Industry Press,1998.