CHATELAIN J,GODART B,DUCHENE J L.Detection,Diagnosis, and Monitoring of Cracked Prestressed Concrete Bridges[C]//NOWAD A S.Proceedings of the NATO Advanced Research Workshop on Bridge Evaluation,Repair and Rehabilitation.Dordrecht:Kluwer Academic Publishers,1990:145-159.
PODOLNY W J.The Cause of Cracking in Post Tensioned Concrete Box Girder Bridges and Retrofit Procedures[J].PCI Journal,1985,30(2):82-139.
[12]
MOON D Y,SIM J,OH H.Practical Crack Control During the Construction of Precast Segmental Box Girder Bridges[J].Computers & Structures,2005,83(31/32):2584-2593.
[13]
LI Zeng-feng,TU Chang-wei,ZHONG Wei-jian,et al.The Management of Cracking at the Bottom Slab of Tanzhou Bridge[J].Central South Highway Engineering,1997,22(4):35-39,40.
[14]
HE Hai.Longitudinal Crack Cause Analysis and Prevention Measures of Box Girder Bridge with Varying Depths[J].Central South Highway Engineering,2001,26(3):61-62.
[15]
WEI Le-yong,SHEN Xu-dong,XIAO Ru-cheng,et al.Mechanism and Prevention Countermeasures of Cracking for Bottom Slab in a Continuous Prestressed Concrete Box Girder[J].Structural Engineers,2007,23(2):53-57.
[16]
PENG Yuan-cheng.Cause Analysis and Countermeasures for Bursting Cracks in Box Girder Bottom Slabs of Continuous Rigid-frame Bridges[J].Bridge Construction,2008(3):67-70,78.
[17]
Zhejiang University,Highway Administration of Zhejiang Province.Cracking Mechanism and Prevention Methods for Bottom Slab Crack of Prestressed Concrete Box Bridge[R].Hangzhou:Zhejiang University,2009.
AL-MANASEER A A,PHILLIPS D V.Numerical Study of Some Post-cracking Material Parameters Affecting Nonlinear Solutions in RC Deep Beams[J].Canadian Journal of Civil Engineering,1987,14(5):655-666.
[20]
JTG D62—2004,Code for Design of Highway Re-inforced Concrete and Prestressed Concrete Bridges and Culverts[S].
[21]
XU You-lin,CHENG Zhi-jun,YANG Jian-jun,et al.Experimental Study on Shear Capacity of Concrete Circular Hollow Floor[C]//Tongji University.National Symposium on Cast-in-place Hollow Concrete Floor System.Shanghai:Professional Committee of Concrete Structure of China Engineering Construction Standardized Association,2005:106-112.