李 乔,卜一之,张清华.基于几何控制的全过程自适应施工控制系统研究[J].土木工程学报,2009,42(7):69-77. LI Qiao,BU Yi-zhi,ZHANG Qing-hua.Whole-procedure Adaptive Construction Control System Based on Geometry Control Method[J].China Civil Engineering Journal,2009,42(7):69-77.
[2]
黄晓航,高宗余.无应力状态控制法综述[J].桥梁建设,2010(1):71-74. HUANG Xiao-hang,GAO Zong-yu.A Summarized Account of Unstressed State Control Method [J].Bridge Construction,2010(1):71-74.
[3]
陈常松.超大跨度斜拉桥施工全过程几何非线性精细分析理论及应用研究[D].长沙:中南大学,2007. CHEN Chang-song.Study on Fine Theory of Geometric Nonlinear and Its Application for Super Long-span Cable-stayed Bridge Through Construction Stage[D].Changsha:Central South University,2007.
[4]
陈常松,颜东煌,陈政清.超大跨度斜拉桥的自适应无应力构形控制法[J].中外公路,2008,28(1):64-67. CHEN Chang-song,YAN Dong-huang,CHEN Zheng-qing.Construction Control of Self-adaptive Zero-stress Configure for Super Long-span Cable-stayed Bridge[J].Journal of China & Foreign Highway,2008,28(1):64-67.
[5]
秦顺全.分阶段施工桥梁的无应力状态控制法[J].桥梁建设,2008(1):8-14. QIN Shun-quan.Unstressed State Control Method for Bridges Constructed in Stages[J].Bridge Construction,2008(1):8-14.
[6]
张雷明,刘西拉.当前无应力构形在结构动力分析中的应用[J].岩石力学与工程学报,2004,23(21):3669-3672. ZHANG Lei-ming,LIU Xi-la.Application of Current-unstressed Configuration in Dynamic Analysis of Structures[J].Chinese Journal of Rock Mechanics and Engineering,2004,23(21):3669-3672.
[7]
梁 鹏,肖汝诚,徐 岳.超大跨度斜拉桥的安装构形与无应力构形[J].长安大学学报:自然科学版,2006,26(4):49-53. LIANG Peng,XIAO Ru-cheng,XU Yue.Assembled Geometry and Unstrained Geometry of Super Long Span Cable-stayed Bridges[J].Journal of Chang'an University:Natural Science Edition,2006,26(4):49-53.
[8]
梁 鹏,肖汝诚,孙 斌.超大跨度斜拉桥几何非线性精细化分析[J].中国公路学报,2007,20(2):57-62. LIANG Peng,XIAO Ru-cheng,SUN Bin.Refined Geometrical Nonlinear Analysis for Super-long-span Cable-stayed Bridge[J].China Journal of Highway and Transport,2007,20(2):57-62.
[9]
朱巍志,张 哲,潘盛山,等.自锚式斜拉-悬索协作体系桥合理成桥状态确定的分步算法[J].土木工程学报,2010(10):91-97. ZHU Wei-zhi,ZHANG Zhe,PAN Sheng-shan,et al.Stepwise Method of Calculation for the Rational Finished State of Self-anchored Cable-stayed Suspension Bridges[J].China Civil Engineering Journal,2010(10):91-97.
[10]
MANABEY Y,HIRAHARAN N,MUKASAN N,et al.Accuracy Control on the Construction of Tatara Bridge[C]//IABSE.Cable-stayed Bridges:Past,Present and Future.Zurich:IABSE,1999:322-331.
[11]
颜东煌,陈常松,董道福,等.大跨度钢主梁斜拉桥的自适应无应力构形控制[J].中国公路学报,2012,25(1):55-58,82. YAN Dong-huang,CHEN Chang-song,DONG Dao-fu,et al.Control of Self-adaptive Zero-stress Configuration for Long-span Cable-stayed Bridge with Steel Main Girders[J].China Journal of Highway and Transport,2012,25(1):55-58,82.
[12]
刘宏文.五里亭大桥主桥连续箱梁预制拼装顶推施工技术[J].铁道建筑技术,2004,8(4):11-13. LIU Hong-wen.Prefabrication,Assembly,and Thrus- ting Erection Technology for the Continuous Box Beam of Wuliting Bridge[J].China Railway Construction Technology,2004,8(4):11-13.
[13]
张晔芝,谢晓慧.铁路特大桥钢箱梁顶推过程受力分析及改善方法[J].中国铁道科学,2009,30(3):21-26. ZHANG Ye-zhi,XIE Xiao-hui.The Mechanical Behaviors and Improvement Measures of Railway Grand Bridge During Incremental Launching of the Steel Box Girder[J].China Railway Science,2009,30(3):21-26.
[14]
秦顺全.桥梁施工控制——无应力状态法理论与实践[M].北京:人民交通出版社,2007. QIN Shun-quan.Bridge Construction Control—Theory and Practice of Unstress State Method[M].Beijing:China Communications Press,2007.
[15]
JUNG K,KIM K,SIM C,et al. Verification of Incremental Launching Construction Safety for the Ilsun Bridge, the World's Longest and Widest Prestressed Concrete Box Girder with Corrugated Steel Web Section[J].Journal of Bridge Engineering,2011,16(3):453-460.
[16]
李传习,董创文,张玉平,等.顶推钢箱梁节段定位高程的确定方法[C]//《桥梁》杂志编辑部.2010组合结构桥梁和顶推技术应用学术会议论文集.北京:人民交通出版社,2010:348-351. LI Chuan-xi,DONG Chuang-wen,ZHANG Yu-ping,et al.Determination Method for Positioning Elevation of Segments of Incrementally Launched Steel Box Girder[C]//Editorial Department of Bridge Journal.2010 Annual Meeting Symposium of Composite Bridge and Application of Incremental Launching Technology.Beijing:China Communications Press,2010:348-351.
[17]
吴 皋,颜东煌,许红胜,等.大跨度桥梁钢箱梁拼接顶推施工过程线形控制的若干问题[J].北京交通大学学报,2006,30(增):150-152. WU Gao,YAN Dong-huang,XU Hong-sheng,et al.Several Linear-control Questions of Long Span Steel Box Girder in Spelling and Thrusting Case[J].Journal of Beijing Jiaotong University,2006,30(S):150-152.