史佩栋.桩基工程手册[M].北京:人民交通出版社,2008. SHI Pei-dong.Pile and Pile Foundation Handbook[M].Beijing:China Communications Press,2008.
[2]
王伯惠,上官兴.中国钻孔灌注桩新发展[M].北京:人民交通出版社,1999. WANG Bo-hui,SHANGGUAN Xing.Development of New Technologies of Cast-in-place Bored Pile in China[M].Beijing:China Communications Press,1999.
[3]
JGJ 94—2008,建筑桩基技术规范[S]. JGJ 94—2008,Technical Code for Building Pile Foundations[S].
[4]
费鸿庆,王 燕.黄土地基中超长钻孔灌注桩工程性状研究[J].岩土工程学报,2000,22(5):576-580. FEI Hong-qing,WANG Yan.Research of Super-longhole Bored Pile in Loess Subsoil[J].Chinese Journal of Geotechnical Engineering,2000,22(5):576-580.
[5]
刘金砺,秋仁东,高文生,等.关于长桩超长桩桩基沉降计算问题[J].岩土工程学报,2011,33(增2):38-42. LIU Jin-li,QIU Ren-dong,GAO Wen-sheng,et al.Settlement Calculation of Foundation with Long and Super-long Piles[J].Chinese Journal of Geotechnical Engineering,2011,33(S2):38-42.
[6]
徐 江.地下水位变化引起的桩附加应变响应[J].工业建筑,2009,39(增):735-737. XU Jiang.Study on Additional Strain Response of Piles During Change of Groundwater-level[J].Industrial Construction,2009,39(S):735-737.
[7]
李根义.地下水对地基沉降计算的影响评价[J].地下水,2009,31(4):25-35. LI Gen-yi.Evaluation About Influences of Groundwater on Calculation of Foundation Settlement[J].Ground Water,2009,31(4):25-35.
[8]
王 发,马 磊.地下水位变化引起厂房地基沉降的研究[J].低温建筑技术,2009(5):81-83. WANG Fa,MA Lei.Long-term Settlement Behavior of Pile Foundation Induced by Seasonal Variation of Groundwater Level[J].Low Temperature Architecture Technology,2009(5):81-83.
[9]
CASTELLI F,MAUGERI M.Simplified Nonlinear Analysis for Settlement Prediction of Pile Groups[J].Journal of Geotechnical and Geoenvironmental Engineering,2002,128(1):76-84.